Installation
24 EN
04/2019
NOTICE
The pump can be damaged by unauthorised mechanical strains
being placed on the pump!
Take the pipe up directly before the pump and connect it free
of tension.
3.
Connect the pipe free of tension according to the VDMA
standard sheet 24277. Use compensators.
4.
Ensure that any leaks cannot cause consequential damage.
Install a suitable retainer if necessary.
WARNING
Pumped fluid hazardous to health!
Observe legal regulations regarding the disposal of media
hazardous to health.
5.4 Electrical
connection
WARNING
Risk of electric shock due to incorrect connections!
Electrical
connections
must always be carried out by
authorised specialists.
Observe
VDE
and
utility company regulations.
Install pumps for swimming pools and their protection
according to DIN VDE 0100-702.
Install
a
disconnecting device with at least a 3 mm contact
gap per pole to interrupt the power supply.
WARNING
Risk of electric shock due to voltage on the housing!
An
overload
switch
which is set correctly must be installed for
pumps with three-phase motors without motor protection. In
doing so, observe the values on the motor name plate.
Protect power supply with a ground fault circuit interrupter,
nominal residual current I
FN
≤
30 mA (higher current class if
necessary when other devices are being run at the same
time – always according to the local regulations).
Only use suitable pipe types according to regional