
Commissioning
06|2019 EN
17
5 Commissioning
Before commissioning, check that the power network‘s
voltage and frequency values correspond to those indicated
on the pump’s name plate.
Ensure that the pump is completely submerged.
1. Open the taps completely.
2. Establish
power
supply.
It can take a short time for the water to reach the end of
the piping!
If the integrated sensor detects an absence of water, the
pump stops running. The sensor will make 4 attempts to start
the pump. If the pressure cannot be reset due to a lack of
water, the pump will keep the error message until the pump
is manually reactivated (by turning the power supply off and
on again).
On
Off
Attempt 1
Attempt 2
Attempt 3
Attempt 4
1‘
5‘
15‘
60‘
WG64.010.001-2-P
Fig. .
The pump is equipped with an anti-blocking system.
Following 100 seconds of inactivity the pump will
automatically be turned on for 2 seconds. This prevents the
hydraulic parts from becoming blocked.
Содержание Zismatic 40/10 WE
Страница 3: ...DE DE Originalbetriebsanleitung Zismatic 40 10 WE WG64 005 001 P...
Страница 13: ...Sicherheit 06 2019 DE 11 H max 333 min 111 Q max 333 min 111 A B C 230V C 0 OFF CHEMICALS WG64 011 001 P Abb 1...
Страница 28: ......
Страница 29: ...EN EN Translation of original operation manual Zismatic 40 10 WE WG64 005 001 P...
Страница 53: ......
Страница 54: ......
Страница 55: ......