Spearhead MULTICUT
820
9
Setting Up Your Machine
Before fitting the PTO for the first time, it may be necessary to adjust the length.
There should be maximum engagement of the sliding tubes without bottoming at the
shortest operation position. To check, first connect the mower to the tractor. Pull the
PTO shaft apart and connect to the tractor PTO output shaft and the gearbox input
shaft. Hold the half shafts next to each other in the shortest working position. If
necessary, shorten the inner and outer guard tubes equally (Fig. 1). Shorten the
inner and outer sliding profiles by the same length as the guard tubes. File all sharp
edges and remove burrs. Grease sliding profiles.
To fit the PTO, first clean and grease. Press pins on the yoke and simultaneously
push the PTO drive shaft onto PTO shaft of the tractor until pins engage.
The PTO shaft is fitted with a non-rotating safety guard. It should be secured to the
machine and tractor with the two retaining chains provided.
Connect the three hydraulic hoses, two wing hoses to a double acting service, with a
dump facility. This is particularly important for the spool valve that operates the wings
as, when in work the wings must be able to follow the ground contours. The 3
rd
hose
for the height ram only requires a single acting spool.
Содержание MULTICUT 820
Страница 1: ...Spearhead MULTICUT 820 1 MULTICUT 820 7th Edition October 2013 Part No 8999026 ...
Страница 25: ...Spearhead MULTICUT 820 25 ...
Страница 26: ...Spearhead MULTICUT 820 26 ...