background image

MULTICUT 160/200 

 

 

3

 

IMPORTANT

 

VERIFICATION

 

OF

 

WARRANTY

 

REGISTRATION

 

 

 

DEALER WARRANTY INFORMATION & REGISTRATION VERIFICATION

 

It

 

is

 

imperative

 

that

 

the

 

selling

 

dealer

 

registers

 

this

 

machine

 

with

 

Spearhead

 

Machinery

 

Limited

 

before

 

delivery

 

to

 

the

 

end

 

user

 

 

failure

 

to

 

do

 

so

 

may

 

affect

 

the

 

validity

 

of

 

the

 

machine

 

warranty

.

 

 

To

 

register

 

machines

 

go

 

to

 

the

 

Spearhead

 

Machinery

 

Limited

 

web

 

site

 

at

 

www.spearheadmachinery.com

,

 

log

 

onto

 

Dealer

 

Inside

 

and

 

select

 

the

 

Machine

 

Registration

 

button

 

which

 

can

 

be

 

found

 

in

 

the

 

Service

 

Section

 

of

 

the

 

site.

 

Confirm

 

to

 

the

 

customer

 

that

 

the

 

machine

 

has

 

been

 

registered

 

in

 

the

 

section

 

below.

 

Should

 

you

 

experience

 

any

 

problems

 

registering

 

a

 

machine

 

in

 

this

 

manner

 

please

 

contact

 

the

 

Spearhead

 

Service

 

Department

 

on

 

01789

 

491867.

 

 

Registration

 

Verification

 

 

 

Dealer

 

Name:

 

……………………..…………………………………………………………….

 

Dealer

 

Address:

 

…….………………………………………………………………………….

 

Customer

 

Name:

 

……………………..…………………………………………………………

 

Date

 

of

 

Warranty

 

Registration:

      

……/……/...……

  

Dealer

 

Signature:

 

………………..……

      

 

 

NOTE TO CUSTOMER / OWNER 

Please

 

ensure

 

that

 

the

 

above

 

section

 

has

 

been

 

completed

 

and

 

signed

 

by

 

the

 

selling

 

dealer

 

to

 

verify

 

that

 

your

 

machine

 

has

 

been

 

registered

 

with

 

Spearhead

 

Machinery

 

Limited.

  

 

IMPORTANT:

 

During

 

the

 

initial

 

‘bedding

 

in’

 

period

 

of

 

a

 

new

 

machine

 

it

 

is

 

the

 

customer’s

 

responsibility

 

to

 

regularly

 

inspect

 

all

 

nuts,

 

bolts

 

and

 

hose

 

connections

 

for

 

tightness

 

and

 

re

tighten

 

if

 

required.

 

New

 

hydraulic

 

connections

 

occasionally

 

weep

 

small

 

amounts

 

of

 

oil

 

as

 

the

 

seals

 

and

 

joints

 

settle

 

in

 

 

where

 

this

 

occurs

 

it

 

can

 

be

 

cured

 

by

 

re

tightening

 

the

 

connection

 

 

refer

 

to

 

torque

 

settings

 

chart

 

below.

 

The

 

tasks

 

stated

 

above

 

should

 

be

 

performed

 

on

 

an

 

hourly

 

basis

 

during

 

the

 

first

 

day

 

of

 

work

 

and

 

at

 

least

 

daily

 

thereafter

 

as

 

part

 

of

 

the

 

machines

 

general

 

maintenance

 

procedure.

 

 

CAUTION:

 

DO

 

NOT

 

OVER

 

TORQUE

 

HYDRAULIC

 

FITTINGS

 

AND

 

HOSES

 

 

TORQUE

 

SETTINGS

 

FOR

 

HYDRAULIC

 

FITTINGS

 

HYDRAULIC

 

HOSE

 

ENDS

 

 

PORT

 

ADAPTORS

 

WITH

 

BONDED

 

SEALS

 

BSP

 

Setting

 

Metric

 

 

BSP

 

Setting

 

Metric

 

1/4”

 

18

 

Nm

 

19

 

mm

 

 

1/4”

 

34

 

Nm

 

19

 

mm

 

3/8”

 

31

 

Nm

 

22

 

mm

 

 

3/8”

 

47

 

Nm

 

22

 

mm

 

1/2”

 

49

 

Nm

 

27

 

mm

 

 

1/2”

 

102

 

Nm

 

27

 

mm

 

5/8”

 

60

 

Nm

 

30

 

mm

 

 

5/8”

 

122

 

Nm

 

30

 

mm

 

3/4”

 

80

 

Nm

 

32

 

mm

 

 

3/4”

 

149

 

Nm

 

32

 

mm

 

1”

 

125

 

Nm

 

41

 

mm

 

 

1”

 

203

 

Nm

 

41

 

mm

 

1.1/4”

 

190

 

Nm

 

50

 

mm

 

 

1.1/4”

 

305

 

Nm

 

50

 

mm

 

1.1/2”

 

250

 

Nm

 

55

 

mm

 

 

1.1/2”

 

305

 

Nm

 

55

 

mm

 

2”

 

420

 

Nm

 

70

 

mm

 

 

2”

 

400

 

Nm

 

70

 

mm

 

 

Содержание 8999008

Страница 1: ...MULTICUT 160 200 1 MULTICUT 160 200 Edition 4 0 May 2019 Part No 8999008...

Страница 2: ...relates to please contact the After Sales Department for advice Spearhead Machinery Limited 2003 Spearhead Machinery Green View Salford Priors Evesham Worcestershire WR11 8SW Tel 01789 491860 Fax 0178...

Страница 3: ...the selling dealer to verify that your machine has been registered with Spearhead Machinery Limited IMPORTANT During the initial bedding in period of a new machine it is the customer s responsibility...

Страница 4: ...rranty does not apply to any expendable items such as blades flails bushes belts flap kits skids shields guards wear pads or pneumatic tyres 1 05 Temporary repairs and consequential loss i e oil downt...

Страница 5: ...h herein and implied warranties with respect to the goods including but not limited to merchantability and fitness for a particular purpose 3 02 The manufacturer makes no warranty as to the design cap...

Страница 6: ...Safety of Machinery Risk Assessment Part 1 Principles Part 2 Practical Guide and Examples of Methods BS EN ISO 12100 1 2010 Safety of Machinery Part 1 Basic Terminology and Methodology Part 2 Technic...

Страница 7: ...or Requirements 10 Attaching To The Tractor 11 Setting Up Adjustments 14 Machine Protection 14 Operation 15 Transportation 15 Servicing Maintenance Safety First 16 Torque Settings 16 Daily Every 8 Hou...

Страница 8: ...nning Never stop the engine with the PTO engaged Always check that all guards are properly fitted check there are no damage or loose parts Particular attention should be given to the flails to ensure...

Страница 9: ...g Warning Shut off engine and remove key Warning Carefully read operator s manual before handling this machine Observe instructions and safety rules when operating Warning Do not remove open guard War...

Страница 10: ...rhead strongly recommends 40hp min MC160 45hp min MC200 tractor with CATEGORY 2 rear linkage Ensure there is sufficient weight on front wheels of the tractor for safe transport and stability PTO must...

Страница 11: ...To check first connect the mower to the tractor Pull the PTO shaft apart and connect to the tractor PTO output shaft and the gearbox input shaft Hold the half shafts next to each other in the shortest...

Страница 12: ...d additional assistance please contact your local implement dealer or qualified service centre 1 Remove shielding 2 Shorten drive tubes by required length In normal conditions telescoping tubes must a...

Страница 13: ...int System shortening the driveline will involve removal of the plastic ring which connects the shield tubes If it is necessary to remove this collar ADD A RETAINING CHAIN TO THE TRACTOR SIDE OF THE D...

Страница 14: ...found it is recommended that the operator reduces the engine revs to allow the blades to pivot more easily when striking solid objects and proceed with caution The clutch settings should not be altere...

Страница 15: ...he wire ropes Select a sensible forward speed bearing in mind the density of growth the terrain and the available horsepower taking extra care when turning particularly on slopes When turning it is no...

Страница 16: ...ntenance is completed It is imperative that the following checks are carried out in order not to invalidate your warranty these are carried out before the first operation after the first hour then aft...

Страница 17: ...pping of string plastic grass or other debris between rotor boss and blades Inspect gearbox seals for leaks Regularly check the rotor boss retaining castle nut for tightness part no 5771409 First remo...

Страница 18: ...st be replaced when new blades are to be fitted If the blades are showing any signs of severe wear damage or cracking they must be replaced immediately Never attempt to weld the blades this will make...

Страница 19: ...is any sign of over hearing wear or cracking replace with new Do not attempt to use the machine with damaged slip clutch plates Assemble the clutch and tighten the bolts to achieve a h length of 17mm...

Страница 20: ...nough overlap 6 Lack of grease 7 Build up of Debris under drive shaft Gearbox Overheating 1 Incorrect oil grease level 2 Incorrect grade of oil grease 3 Incorrect operating speed 4 Machine overloaded...

Страница 21: ...MULTICUT 160 200 21 Spearhead Machinery Green View Salford Priors Evesham Worcestershire WR11 8SW Tel 01789 491860 Fax 01789 778683 www spearheadmachinery com enquiries spearheadmachinery com...

Отзывы: