Page 7
Uncrating and Prep
If you received your machine crated, position crate so that your truck can be backed up to “front” side.
Now remove end of crate marked “front”. Remove hitch assembly from under machine. Connect and
tape wire plugs and attach hitch to frame with bowmalloy bolts provided. These bolts
must
be torqued to
74 ft.-lbs. (see Fig. 1).
It is the uncraters responsibility to torque the hitch.
Support the hitch and
remove vertical supports under frame. Hook up jet to truck and pull from crate. Remove packing materials
from jet. Door and engine keys are packed in a bag in the toolbox. Remove the contents.
If you receive your machine uncrated.
Upon receiving your machine double check the torque of all 7 hitch bolts. (See Fig. 1.)
Battery
Prior to shipping, the battery cables are disconnected from the terminals of the battery. The battery cables
will need to be reconnected to the battery before operating.
Fig. 1
S
S
S
S
S
!
Содержание 758 Water Jet
Страница 26: ...Page 26 758 Pump System Malfunction Chart Use SAE 90 Gear Oil...
Страница 30: ...Page 30 Wiring Diagrams cont...
Страница 33: ...Page 33 758 Final Assembly cont 58 96 142 145 67 90 38 100 3 78 99 63 152 151...
Страница 42: ...Page 42 758 Pump Assembly 75802700...
Страница 43: ...Page 43 758 Pump Assembly 75802700...
Страница 52: ...Page 52 758 Power Pak 75820200...
Страница 53: ...Page 53 758 Power Pak 75820200...
Страница 58: ...Page 58 Hitch Tube Assembly 73806800...
Страница 62: ...Page 62 758 Pump Exploded View...