Page 19
Lubrication & Maintenance (cont.)
Oil rewind drive
chain every 50
hours (SAE 30
or heavier).
Grease rewind
engagement
mechanism
every 25 hours.
Oil rewind
final drive
chain every
50 hours
(SAE 30 or
heavier).
High Pressure Reel Assembly
Pump
Fill
Change pump oil after first 50 hours of operation, then at regular intervals of 500 hours or less depending on operating
conditions. Use SAE 90 Gear Oil.
Содержание 758 Water Jet
Страница 26: ...Page 26 758 Pump System Malfunction Chart Use SAE 90 Gear Oil...
Страница 30: ...Page 30 Wiring Diagrams cont...
Страница 33: ...Page 33 758 Final Assembly cont 58 96 142 145 67 90 38 100 3 78 99 63 152 151...
Страница 42: ...Page 42 758 Pump Assembly 75802700...
Страница 43: ...Page 43 758 Pump Assembly 75802700...
Страница 52: ...Page 52 758 Power Pak 75820200...
Страница 53: ...Page 53 758 Power Pak 75820200...
Страница 58: ...Page 58 Hitch Tube Assembly 73806800...
Страница 62: ...Page 62 758 Pump Exploded View...