2
L100001
3
IMPORTANT
This fireplace is designed for a minimum 1 foot of vertical vent pipe rise before any horizontal vent pipe run.
See pages 13-14 for Vent Installation details.
CONTENTS
Important Safety Information .......................... 3
Product Features............................................ 5
Code Approval ................................................ 5
Pre-Installation Information............................. 6
Installing Above 2000 Feet .......................... 6
Orifice Sizes, Pressures and BTUs ................ 6
Before You Install ........................................ 6
Fireplace Framing ........................................ 7
Fireplace Dimensions .................................. 8
Fireplace Location ....................................... 9
Securing Fireplace to Floor or Framing .......... 10
Clearances................................................... 11
Installation Information................................. 12
Installation Precautions ............................. 13
Installation Planning .................................. 14
Rear Wall Vent Installation ......................... 17
Horizontal Termination Configuration........... 19
Below Grade Installation ............................ 21
Vertical Through-the-Roof Installation .......... 22
Installation for Vertical Termination..............23
Cathedral Ceiling Installation...................... 24
Fireplace Installation .................................... 25
Check Gas Type ........................................ 25
Installing Gas Piping to Fireplace/Burner
Checking Gas Pressure................................. 27
Electrical Installation.................................... 28
Electrical Wiring ........................................ 28
Wall Switch ............................................... 28
Glass Removal ............................................. 29
Final Installation........................................... 30
Operating Instructions ..................................
33
What To Do If You Smell Gas ...................... 3
3
Initializing System
for the First Time
............. 3
3
To Turn Off Gas.......................................
.
.. 3
4
Cleaning and Maintenance............................ 3
7
Burner, Pilot and Control Compartment....... 3
7
Pilot Flame
...............................................
37
Burner Flame
............................................ 3
7
Air Shutter Assembly
..................................
37
Vent System ............................................. 3
8
Glass
Panel
............................................... 3
8
Stones, Media
........................................... 3
8
Fan Assembly
................................................
3
8
Replacement Parts....................................... 3
9
Vent Components...................................... 3
9
Firebox Components..................................
40
Warranty ......................................... Back Cover
Vent Installation ....................................
..............
.......
1
2
Gas Connection
...................................
...
....
2
6
Media Tr
a
y
Placement
......................
......
.
. 30
Filling With Media
....................................... 30
Operating Instructions
................................... 33
S
I
T
Proflame Wiring Diagram
.......................
41
Troubleshooting............................................
4
3
Safety screen ...
....................................... 3
1