1
5
INSTALLATION
Continued
WARNING: Never connect
natural gas fireplace to private
(non-utility) gas wells. This
gas is commonly known as
wellhead gas.
Installation Items Needed
Before installing fireplace, make sure you have
the items listed below.
• external regulator for propane/LP unit only
(supplied by installer)
• piping (check local codes)
• sealant (resistant to propane/LP gas)
• equipment shutoff valve *
• test gauge connection *
• sediment trap (optional)
• tee joint
• pipe wrench
• approved flexible gas line with gas connector
(if allowed by local codes) (not provided)
as shown in Figure
5
. Pointing the vent down
protects it from freezing rain or sleet.
* Purchase the optional CSA design-certified
equipment shutoff valve from your dealer.
** Minimum inlet pressure for purpose of input
adjustment.
Figure
6
- Gas Connection
Sediment Trap
CSA Design-Certified
Equipment Shutoff Valve
With 1/8" NPT Tap*
3" Minimum
Cap Pipe Tee
Nipple Joint
CAUTION: Use only new,
black iron or steel pipe. Inter-
nally-tinned copper tubing may
be used in certain areas. Check
your local codes. Use pipe of
1/2" diameter or greater to allow
proper gas volume to fireplace.
If pipe is too small, undue loss
of volume will occur.
Installation must include an equipment shutoff
valve, union and plugged 1/8" NPT tap. Locate
NPT tap within reach for test gauge hook up.
NPT tap must be upstream from fireplace
.
IMPORTANT:
Install equipment shutoff valv
e
in an accessible location. The equipment shutoff
valve is for turning on or shutting off the gas to
the appliance.
Check your building codes for any special re-
quirements for locating equipment shutoff valve
to fireplaces
.
Apply pipe joint sealant lightly to male NPT
threads. This will prevent excess sealant from
going into pipe. Excess sealant in pipe could result
in clogged fireplace valves. Never use sealant on
flare threads.
Propane/LP
Supply Tank
External
Regulator
Figure
5
- External Regulator With Vent
Pointing Down
Vent
Pointing
Down
SHUTOFF VALVE
A CSA design-certified equipment shutoff valve
with 1/8" NPT tap is an acceptable alternative to
test gauge connection. Purchase the optional CSA
design-certified equipment shutoff valve from your
dealer.
For propane/LP units, the installer must supply
an external regulator. The external regulator will
reduce incoming gas pressure. You must reduce
incoming gas pressure to between 11 and 1
3
inches
of water. If you do not reduce incoming gas pres-
sure, heater regulator damage could occur. Install
external regulator with the vent pointing down
Natural Gas
From Gas Meter
(5" W.C.** to 10.5"
W.C. Pressure)
Propane/LP
From External
Regulator
(11" W.C.** to 1
3
"
W.C. Pressure)