background image

SECTION 6: SET THE TRAVEL LIMIT

1.  Start Remote – Insert key and turn to right to

power lift operation.

2. Up/Down Buttons – Arrows display GREEN to

indicate directions possible (i.e.  stowed lift will
only go down).

3. Obstacle Detection – If lift hits obstruction, both

arrows display RED.

4. Set Bottom Limit – To set the lift bottom travel

limit (with ceiling cover installed): 

Lower lift until it almost touches the floor. 

NOTE: Should the lift reach the floor DO NOT
continue to push DOWN as this may cause the
cables to  unspool.

Leave 1-inch clearance

between the bottom of the ceiling cover and 

the floor.

a.  Turn remote key to OFF position.

b.  Press and hold BOTH buttons and

return key to ON position.

c.  Release both buttons. Arrows will flash

RED three times.

d.  Press the DOWN button to set the 

bottom limit.

e.  BOTH arrows will flash RED three times,

then remote will return to normal operating 

mode.

f. Press UP button and return lift

to stowed position.

5. Power Off – Turn key to left and remove. 

6. Reset to Maximum Vertical Travel

If the lift is stopping at some inconvenient height
(showing only the up arrow) the bottom limit can be
restored at any time to the maximum vertical travel
limit by the following method.

a.  Turn remote key to OFF position.

b.  Press and hold BOTH buttons and

return key to ON position.

c.  Release both buttons. Arrows will 

flash RED three times.

Page 6       SpaceLift 5200 Series Attic Lift Manual (10/14)

d.  Press the UP button to reset the 

bottom limit.

e.  BOTH arrows will flash RED three times,

then remote will return to normal operating 

mode.

f. Press UP button and return lift to

stowed position.

Содержание 5200 Series

Страница 1: ...y Factory assembled for ease of installation Wall mounted control unit with key lock Load management system Two year factory warranty 5200 SERIES SPECIFICATIONS Lift Weight Capacity 200 lbs Lift Speed 3 inches per second Max Vertical Travel to 15 feet Joist Ceiling Depth 7 to 14 inches Platform Leveling Variable adjustment Power Requirement 110 VAC 120 VAC Tethers Stainless steel cable Remote Cont...

Страница 2: ...ON AND ORIENTATION REQUIREMENTS Orientation Lift must be oriented such that its length is parallel to the floor joists Finished Floor Top floor must be finished with 1 2 inch to 3 4 inch plywood or comparable material Electrical Outlet An electrical outlet must be located within 4 feet of mounted lift system Load Support Floor must support loads as specified in local residential building codes Pow...

Страница 3: ...ic access a material lift may be required to move the unit into attic space through an attic door or the rough cut opening in ceiling drywall STEP 2 INSTALL MOUNTING STRIPS 1 Cut 2 inch x 2 inch wood Mount Strips to width of framed opening to fit inside short side of frame NOTE If the rough opening size is increased to accommodate joist hanger or other protrusion into the recommended rough opening...

Страница 4: ...ound perimeter of the cargo lift system so that it is centered and prevented from horizon tal motion within rough opening Do not deform unit walls SECTION 4 MOUNT THE REMOTE CONTROL UNIT IMPORTANT NOTE The Remote Control Unit must be mounted to allow a clear line of sight to the 5200 lift system and be at least 4 feet above the ground clear of any moving parts of the lift and clear of any obstruct...

Страница 5: ...ll the four Threaded Standoffs into the threaded holes on each corner of the tray with the square jam nuts loose Run the lift up until the lift reaches the final stowed position 4 Adjust each standoff so the bottom of the flange nut is 1 4 inch below the ceiling Tighten the square jam nuts NOTE The ceiling cover will be stretched away from the standoffs as the tray comes to its final stow posi tio...

Страница 6: ...both buttons Arrows will flash RED three times d Press the DOWN button to set the bottom limit e BOTH arrows will flash RED three times then remote will return to normal operating mode f Press UP button and return lift to stowed position 5 Power Off Turn key to left and remove 6 Reset to Maximum Vertical Travel If the lift is stopping at some inconvenient height showing only the up arrow the botto...

Страница 7: ...elerate stop and automatically slowly settle onto the floor provided bottom limit is set correctly With tray on the floor only the Up Button will be illuminated green indicating only upward travel is possible Pressing the Down Button will do nothing Pressing and holding the Up Button starts the following sequence Tray will slowly lift off the floor allowing the micro processor to weigh the load If...

Страница 8: ...on until the lift cycle is complete To halt operation release the but ton any time during the lift cycle STEP 5 Unload lift platform STEP 6 Turn Key OFF when lift operations are complete NOTE If power is lost during operation the lift will stop When power is restored depress the Up Button and return the lift to the fully stowed and locked position This enables the system to reset to assure consist...

Страница 9: ... ANY OTHER LEGAL THEORY AND WHETHER ADVISED OF THE POSSIBILITY OF SUCH DAMAGES Local Law This Limited Warranty Statement gives the customer specific legal rights The customer may also have other rights which vary from state to state in the United States from province to province in Canada and from country to country elsewhere in the world To the extent that this Limited Warranty Statement is incon...

Отзывы: