OPERATION & MAINTENANCE MANUAL
Revision 2022
_____________________________________________________________________________________
III.C - 1/3
III.C HITCHING
The implement described in this manual do apply to any kind of tractor provided of universal
three-point hitch.
The characteristics of this linkage depend on the type of tractor, therefore it is necessary to
setting up the tractor in order to properly hitch the implement.
This operation must be carried out on a flat and firm area as it is dangerous.
Do not allow anyone to stay between tractor and implement while the engine is
running
Follow these instructions:
1.
Connect the tractor two lifting arms to the lower plates of the implement by using two
hitch pins and two cotter keys to lock pins in place (see Fig. 1)
Figure 1
2.
Connect the tractor top link to the mast of implement by using hitch pin and a cotter
key to lock pin in place (see Fig. 1)
3.
Lift up the implement off the ground
4.
While remaining in the driving seat, put the tractor PTO in neutral position
MAST
LOWER PLATES
Содержание PL 180
Страница 38: ......