background image

Instruction Sheet

 

Convertible Climbing Wall - Block/Brick Wall  110010 

Store these instructions with the enclosed maintenance checklist 
in a safe place.  You may also access them on our website.

 

Take time to familiarize yourself with the use and maintenance of this equipment before using.  Please file this 
Instruction Sheet in an accessible location:  the Instruction Sheet must be read and familiar to anyone who is 
using Southpaw Enterprises Equipment.   

IMPORTANT: Please check equipment immediately for any damage that may have resulted during shipping.   
If any damage has occurred, please contact Southpaw Enterprises, Inc. immediately. 

 
Caution should be used at all times when using this equipment.  It is imperative that clients be under constant 
supervision while climbing.  Mats of appropriate thickness should be used.  A client’s strength, skills, and abili-
ties must be taken into consideration when determining how closely to spot him or her.  Some clients will re-
quire  almost  constant,  hands-on  support,  while  others  may  be  able  to  climb  completely  without  assistance.  
You, as the therapist, must make this decision based on your knowledge of the client’s skills and aptitude.  Do 
not have more than one client on the wall at a time unless proper supervision can be administered for each cli-
ent.  Failure to take these things into consideration increases risk of mishap or injury.  
 
 
MATERIALS LIST: 

 

 

 

 

 

TOOLS NEEDED: 

 

 

 

 

 
  3 - 29” X 57” Wood Panels 

 

  3 - 1-5/8” x 13/16” x 50-1/4” Slotted Channels   

 

Drill and 7/8” masonry drill bit 

  2 - Upright Assemblies  

 

 

 

 

7/32” and 5/16” Hex Allen Wrenches 

20 - Hand-holds with attachment bolts   

 

 

Tape Measure 

  1 - Hardware Package                 

 

 

 

Pencil  or Marker 

  1 - Instruction Sheet   

 

 

 

 

Level 

  1 - Maintenance Checklist 

 

 

 

 

Step Ladder 

 

TWO PEOPLE REQQUIRED FOR ASSEMBLY 
 
WEIGHT LIMIT: 300 LBS. 
 
ATTACHING HORIZONTAL CHANNEL TO WALL (Figure 1): 

 

 

Once location has been determined for climbing wall, measure up from the floor and make a mark at 23”, 67”, and 
83”.  Using a level, draw a line between the outside edges where horizontal channel will be placed.  Drill a  pilot hole 
into the wall at each point for the screws, approximately 16” apart.

 

 

Place the channel against the wall with the open side facing out to make sure that the slotted holes in the channel 
line up with the holes drilled in the wall.

 

 

Put a 5/16” washer on a lag bolt.  Because the 1-3/8” washers are too large to simply place it into the strut, you will 
need to slide it into the end of the channel and line it up with one of the end slots.  Line up the end slot/washer with 
the far-left, bottom pilot  hole.  Put the lag bolt  w/ 5/16” washer through the big  washer and the channel (from the 
open side of the channel) into the pilot hole.  Screw the lag bolt into the pilot hole, but do not tighten all the way.  
Repeat on the opposite end of the channel, then in the two center slots using a 5/16” and an 1-3/8” washer on each 
bolt.  Now, tighten the lag bolts while holding the center of the channel on the horizontal line.  Repeat this operation 
on the remaining two lines.

 

Содержание 110010

Страница 1: ...ST TOOLS NEEDED 3 29 X 57 Wood Panels 3 1 5 8 x 13 16 x 50 1 4 Slotted Channels Drill and 7 8 masonry drill bit 2 Upright Assemblies 7 32 and 5 16 Hex Allen Wrenches 20 Hand holds with attachment bolts Tape Measure 1 Hardware Package Pencil or Marker 1 Instruction Sheet Level 1 Maintenance Checklist Step Ladder TWO PEOPLE REQQUIRED FOR ASSEMBLY WEIGHT LIMIT 300 LBS ATTACHING HORIZONTAL CHANNEL TO ...

Страница 2: ...s of channel Take the six button head screws and put a 3 8 flat washer on each one Slide the 1 3 8 flat washers into the end of the channel and line them up with the marked slots Put a screw and washer through the 1 3 8 washer and slot and put a 3 8 channel nut on the screw Be sure to put the grooves in the nut are towards the head of the screw Do this at all six of the marked holes Place the upri...

Страница 3: ...he panels in the vertical position Failure to observe this could result in injury if the panel were to slide out when in use 2 To use the panels in the sloped configuration remove the two locking screws grasp the bottom panel and slide it out The panels will roll on the wheels and stop in the proper position Always make sure that the panels are pulled completely out before using in the sloped conf...

Страница 4: ...Safety Precautions The safety of your clients is dependent on the appropriate choice of activity to match yet challenge their physical abilities Use appropriate spotting safety techniques In addition the layout of your activity area proper installation and maintenance of your equipment is critical Southpaw equipment is not intended for recreational or outdoor use Under no condition should this equ...

Страница 5: ......

Страница 6: ...Figure 1 ...

Страница 7: ......

Страница 8: ...Figure 2 ...

Страница 9: ......

Страница 10: ...Figure 3 ...

Страница 11: ...epeat on the opposite end of the channel then in the two center slots using a 5 16 and an 1 3 8 washer on each bolt Now tighten the lag bolts while holding the center of the channel on the horizontal line Repeat this operation on the remaining two lines Instruction Sheet Convertible Climbing Wall Wood Stud Wall 110011 Store these instructions along with the enclosed maintenance checklist in a safe...

Страница 12: ...ese screws and nut will work the same way as when you attached the panel to the uprights Measure up from the bottom and mark the slotted holes at 23 67 and 83 on both of the slotted pieces of channel Take the six button head screws and put a 3 8 flat washer on each one Slide the 1 3 8 flat washers into the end of the channel and line them up with the marked slots Put a screw and washer through the...

Страница 13: ...jury if the panel were to slide out while in use To use the panels in the sloped configuration remove the two screws grasp the bottom panel and slide it out The panels will roll on the wheels and stop in the proper position Always make sure that the panels are pulled completely out before using in the sloped configuration Put the two bolts that were removed in a safe place out of the reach of clie...

Страница 14: ...e any questions or comments please call or write Southpaw Enterprises Inc P O Box 1047 Dayton Ohio 45401 1047 Toll Free 800 228 1698 Please visit us at www southpaw com 2019 Southpaw Enterprises Inc STORAGE PROCEDURES Keep hex wrenches in a safe location out of the reach of clients Keep the 3 8 16 x 1 1 2 flat head socket head screws in a safe location out of the reach of clients when they are rem...

Страница 15: ...Figure 1 ...

Страница 16: ...Figure 2 ...

Страница 17: ...Figure 3 ...

Страница 18: ...Figure 4 ...

Страница 19: ...te end of the channel then in the two center slots using a 5 16 and an 1 3 8 washer on each bolt Now tighten the toggle bolts while holding the center of the channel on the horizontal line Repeat this operation on the remaining two lines ATTACHING THE CENTER PANEL TO THE VERTICAL CHANNEL Figure 2 Instruction Sheet Convertible Climbing Wall Metal Stud Wall 110012 Store these instructions along with...

Страница 20: ...les at 23 67 and 83 on both of the slotted pieces of upright channel Take the six button head screws and put a 3 8 flat washer on each one Slide the 1 3 8 flat washers into the end of the channel and line them up with the marked slots Put a screw and washer through the 1 3 8 washer and slot and put a 3 8 channel nut on the screw Be sure to put the grooves in the nut are towards the head of the scr...

Страница 21: ...nels will roll on the wheels and stop in the proper position Always make sure that the panels are pulled completely out before using in the sloped configuration Put the two bolts that were removed in a safe place out of the reach of clients MAINTENANCE CHECKLIST All of the following wear points should be checked as indicated and recorded on the checklist enclosed Weekly All hand holds MUST be chec...

Страница 22: ... that pertains to your facility If you have any questions or comments please call or write Southpaw Enterprises Inc P O Box 1047 Dayton Ohio 45401 1047 Toll Free 800 228 1698 Please visit us at www southpaw com 2019 Southpaw Enterprises Inc Keep the 3 8 16 x 1 1 2 flat head socket head screws in a safe location out of the reach of clients when they are removed for conversion to an angled climbing ...

Страница 23: ...Figure 1 ...

Страница 24: ...Figure 2 ...

Страница 25: ...Figure 3 ...

Страница 26: ...Figure 4 ...

Отзывы: