background image

INSTALLATION 

WARNING: THESE PROCEDURES MUST BE FOLLOWED BY QUALIFIED PERSONNEL OR 

WARRANTY WILL BE VOIDED.

 

GENERAL:

 

The installation must conform with local codes, or in the absence of local codes, with the National Fuel Gas 
Code, ANSI Z223.1  - Latest Edition. Canadian installation must comply with CAN/CGA-B 149.1 Natural Gas 
Installation Code, Code CAN/CGA-B 149.2 Propane Installation Code. 

These models are design certified for operation on Natural or Propane gases. 
The appliance should be connected ONLY to the type of gas for which it is equipped. All Southbend equipment 
is adjusted at the factory. 
NOTE: Check type of gas on serial plate. 

Models: SCB-Series - serial plate located left front comer on bottom inside lower compartment. 

Models: SCBC-Series - remove front control panel. Serial plate attached in the center on the compartment 
front shield to unit. 

NOTE: Each SCB-Series Broiler is a complete unit with an individual 

W

 NPT manifold across its entire width. 

Units can be batteried by joining the unions at the ends of the manifolds. This manifold is not equipped 
directly with a pressure regulator. However, the manifold must be connected with an adequately sized gas 
appliance pressure regulator adjusted to supply a pressure to this manifold as marked on the serial plate; 6" 
W.C. for natural gas and 10" W.C. for propane gas. In addition, the pressure regulator must meet the 
following requirements: 

1.  The pressure regulator installed should be certified by a nationally recognized testing agency. 
2.  The regulator must have a maximum regulation capacity for the total connected load. 
3.  The regulator must have a pressure adjustment range to allow adjustment to the manifold pressure on the 

appliance rating plate. 

4.  Unless the manifold pressure of all connected appliances is the same, a separate regulator must be supplied 

for each unit(s) to indicate unit or units having differing manifold pressures. 

5.  If applicable, the vent line from the gas appliance pressure regulator shall be installed to the outdoors in 

accordance with local codes or, in the absence of local codes, with the National Fuel Gas Code, ANSI Z23.1 - 
Latest Edition. Canadian installation must comply with CAN/CGA-B 149.1 Natural Gas Installation Code, 
Code CAN/CGA-B149.2 Propane Installation Code. 

An adequate gas supply is imperative. Undersized or low pressure lines will restrict the volume of gas required for 
satisfactory performance. A steady supply pressure, between 7" W.C. and 8" W.C. for natural gas and 11"  W.C. 
and 12" W.C. for propane gas is recommended. With all units operating simultaneously, the manifold pressure on 
all units should not show any appreciable drop. Fluctuations of more than 25% on natural and 10% on propane 
gas will create pilot problems and affect burner operating characteristics. Contact your gas company for correct 
supply line sizes. 

As an option, the unit may be supplied with a rear gas connection. The pipe size of this connection is one inch. 
Unless otherwise specified, this connection is welded to the right side of the manifold. 

NOTE: Each SCBC-Series Counter Broiler is a complete unit with an individual ¾” NPT supply connection at 

the rear. An adequate gas supply is imperative. Undersized or low pressure lines will restrict the volume of gas 
required for satisfactory performance. A pressure regulator, which is provided with each unit, is set to maintain 
a 4" W.C. manifold pressure for natural gas and a 10" W.C. manifold pressure for propane gas. However, to 
maintain these conditions the pressure on the supply line, when all units are operating simultaneously, should 
not drop below 7" W.C. for natural gas or 11” W.C. for propane gas. 

A 1/8” pressure tap is located on the manifold of each unit. 

All pipe joints should be tested for leaks with a soap and water solution before operating the unit. The test 
pressure should not exceed 14" W.C. 

CAUTION:

 

THIS APPLIANCE AND ITS INDIVIDUAL SHUTOFF VALVE MUST BE DISCONNECTED 

FROM THE GAS SUPPLY PIPING SYSTEM DURING ANY PRESSURE TESTING OF THAT 
SYSTEM AT TEST PRESSURES IN EXCESS OF 112 PSIG (3.45 kPa). 
THIS APPLIANCE MUST BE ISOLATED FROM THE GAS SUPPLY PIPING SYSTEM BY CLOSING 
ITS INDIVIDUAL MANUAL SHUTOFF VALVE DURING ANY PRESSURE TESTING OF THE GAS 
SUPPLY PIPING SYSTEM AT TEST PRESSURES EQUAL TO OR LESS THAN 112 PSIG (3.45 
kPa). 

 

 

CHAR BROILERS  
SECTION ONE — INSTALLATION

 

PAGE 2

 

Litho in U.S.A. 

11-92

 

Содержание SCB-24

Страница 1: ...king equipment then the terms and conditions of the Manufacturer s Limited Warranty will be rendered void and no warranty of any kind shall apply If the equipment has been changed altered modified or...

Страница 2: ...CONTENTS SECTION ONE INSTALLATION Specifications 1 Installation 2 SECTION TWO USER S GUIDE Warranty 1 Operation 2 Maintenance 4 SECTION THREE SERVICE Adjustments 1 Troubleshooting 2 SECTION FOUR PARTS...

Страница 3: ...le for consequential or special damages of any nature that may arise in connection with such product or part Should service be required at times which normally involve overtime or premium labor rates...

Страница 4: ...s and 4 W C for counter type broilers Propane manifold pressure should be 10 W C for all PILOT ADJUSTMENTS ALL PILOT FLAMES SHOULD BE STABLE AND NOT CARBON PRODUCING All pilots are adjustable by turni...

Страница 5: ...ifices produce excessive carbon Primary air not adjusted properly deposits burners B Counter model produces Same as above excessive carbon deposits burners Only some pilots produce Pilot gas not adjus...

Страница 6: ...tles Under Fired Broilers Cook Hold Convection Ovens Fryers Tilting Braising Pans Salamander Broilers Bake Roast Ovens Special Custom Equipment Cooker Mixer Kettles Cheese Melters Pizza Ovens Convecti...

Страница 7: ...rvice may be necessary to extend the useful life of this unit When service is needed contact a Southbend Authorized Service Agency or your dealer To avoid confusion always refer to the model number se...

Страница 8: ...for the first time change only After the original change or on new style units the valve only can be changed DISCONTINUED PART 1176750 Valve This part will be available until existing stock is deplet...

Страница 9: ...1 15 94 1176009 21 80 4440401 29 00 Other parts are in the current price list TE dy 2 1166011 KNOB 1 1 1176009 HI LOW VALVE PROP 1 4440401 BURNER VALVE REPLACEMENT KIT ITEM PART NO DESCRIPTION Qty ACA...

Страница 10: ...for the first time change only After the original change or on new style units the valve only can be changed DISCONTINUED PART 1076750 Valve This part will be available until existing stock is deplet...

Страница 11: ...1 15 94 1176008 21 80 4440402 29 00 Other parts are in the current price list TE dy 2 1166011 KNOB 1 1 1176008 HI LOW VALVE NAT 1 4440402 BURNER VALVE REPLACEMENT KIT ITEM PART NO DESCRIPTION Qty ACAD...

Страница 12: ...b The kit is available for the first time change only After the original change or on new style units the valve only can be changed DISCONTINUED PART 1163552 Valve This part will be available until ex...

Страница 13: ...rrel List Prices effective 1 15 94 1176011 23 80 4440399 26 00 1099122 1 00 Other parts are in the current price list TE dy 3 1099121 3 8 CC NUT 2 1099122 3 8 FERRULE 1 1 1176011 VALVE HI LOW PROPANE...

Страница 14: ...knob The kit is available for the first time change only After the original change or on new style units the valve only can be changed DISCONTINUED PART 1163552 Valve This part will be available unti...

Страница 15: ...ers 176008 4440402 Both valves use 1173645 Valve Knob The 1176010 Valve has S10 stamped on the flat side of the Valve Barrel List Prices effective 1 15 94 1176010 23 80 4440400 26 00 1199122 1 00 Othe...

Страница 16: ...an error on pressure regulator usage The following corrects this error and clarifies the usage For Sectional Front Manifold Char Broilers Models SCB 24 36 48 1167782 Pressure Regulator 1 Natural Gas...

Страница 17: ...s 109 1 kg 200 Ibs 90 9kg SCBC 36 SCBC 36R 36 914 30 762 18 457 5 127 13 330 29 737 27 7 8 708 22 559 2 3 8 60 1 38 3ea 40 000 55 1397 39 991 24 610 28 9cu ft 81 cu m 350 Ibs 159 1kg 290 Ibs 131 8kg S...

Страница 18: ...codes with the National Fuel Gas Code ANSI Z23 1 Latest Edition Canadian installation must comply with CAN CGA B 149 1 Natural Gas Installation Code Code CAN CGA B149 2 Propane Installation Code An a...

Страница 19: ...the unit at the top by the control panel NOTE No additional clearance from the sides and back is required for service as the units are serviceable from the front FOR FLOOR MODELS LEGS OR OPTIONAL CAS...

Страница 20: ...D TO SUPPORT THESE UNITS GAS CONNECTION On all threaded connections the pipe joint compound must be approved for use with natural and LP gas L INDIVIDUAL UNITS 1 Remove valve panel 2 Use a long spirit...

Страница 21: ...readily accessible approved hand shutoff valve 8 Open ends of the manifold must be capped 9 Turn off all burner valves 10 Turn on gas supply and immediately check all the unions for leaks USE SOAPY W...

Страница 22: ...ode FRONT FILLER MOUNTING PROCEDURE FIG 2 FLAT TYPE FRONT FILLER 1692 Black 1692SS Stainless Steel APPLICATION Char Broiler battened to a Fryer or Cabinet Based Unit MOUNTING PROCEDURE Align filler eq...

Страница 23: ...UNIT AT CONTROL PANEL Loosen the two screws on the right side of the front filler panel Align the two slots in the front filler with the two screws Push filler in until it is flush with the front of...

Страница 24: ...ase of spillage Types of fillers supplied will be Char Broiler to Range Char Broiler to Drain Cabinet Char Broiler to Fryer Battery Type Broiler to Char Broiler Char Broiler to Fry Top Range Top fille...

Страница 25: ...O WAYS AS FOLLOWS 1 Placed on top of grids 2 In place of two grids CHAR BROILERS SECTION ONE INSTALLATION PAGE9 FRONT RAIL GRATE SUPPORT 24 1172204 36 1172205 48 1172206 Unit Width Number of in Griddl...

Страница 26: ...tural gas manifold pressure is 6 W C Propane gas manifold pressure is 10 W C B Models SCBC Series Unit is set with each burner at 40 000 BTU hour at the factory prior to shipment and should bum reason...

Страница 27: ...ufficient fats to eliminate severe flares while providing desirable broiling results C Broiling Once the fire is hot enough put your steak on the broiler make sure both sides of the steak are seared t...

Страница 28: ...d be removed every few days clinkers removed and grates brushed CAUTION DO NOT OVERLOAD WITH COALS ONE LAYER PLACED AT RANDOM IS SUFFICIENT When grates become too badly warped they should be replaced...

Страница 29: ...horoughly with a clean cloth To remove grease and food splatter or condensed vapors that have baked on the equipment apply cleanser to a damp cloth or sponge and rub cleanser on the metal in the direc...

Страница 30: ...ment for assistance CONTROLS RELATED PARTS PART NUMBER DESCRIPTION SCB 24 SCB 36 SCB 48 SCBC 24 SCBC 36 SCBC 48 1176750 Gas Valve 2 3 4 1163552 Gas Valve 2 3 4 1160532 Valve Knob 2 3 4 1173645 Valve K...

Страница 31: ...d Support 36 attaches to collar plate 1 1 1172445 Top Grid Support 48 attaches to collar plate 1 1 1172213 Top Filler Left for Free Standing 1 1 1 1172214 Top Filler Right for Free Standing 1 1 1 PART...

Отзывы: