P
The Leader in Nitrogen Generation Technology
FPS-900-RS O&M Manual
Version: 3; 3/2020
Page 7 of 28
3. Receiving, Unpacking, and Storage Instructions
3.1. Unpacking and Preparation
The
N
2
-BLAST
®
FPS-900-RS will arrive in a cardboard box. Open the box carefully, and identify and
verify all parts listed on the packing list are present and undamaged. South-Tek Systems (STS) is not
responsible for damages that occur during shipping and handling of the
N
2
-BLAST
®
. Document any
visual damages and report them to the responsible shipping company, and then, contact STS at (888)
526-6284 to assess the damages.
Until Installation:
•
Store the
N
2
-BLAST
®
in a dry and climate controlled (40-100° F) room.
•
Always keep
N
2
-BLAST
®
in an upright position / or, preferably, in the box as shipped.
•
Read entire manual and make all connections (per instructions) before connecting power.
•
Keep all gas lines dry so moisture does not enter generator upon hookup.
•
Never place/stack objects on top of the
N
2
-BLAST
®
.
Remove the nitrogen generator from the cardboard box by carefully lifting the unit out and setting it
on a flat surface. Prepare the wall mounting bracket before moving it to the final location. Carefully,
break down the cardboard box and store in a safe location. Reuse the cardboard box if returning for
factory service.