P
The Leader in Nitrogen Generation Technology
FPS-900-RS O&M Manual
Version: 3; 3/2020
Page 9 of 28
5. Product Installation
5.1. INSTALLATION ARRANGEMENT
See below for basic setup. Refer to the General Arrangement drawing for detailed instructions included
with the installation package:
GA-FPS-00900-RELIABLE
Product Assembly Instructions:
All
N
2
-BLAST
®
FPS-900-RS mounting holes and wall mounting
bracket holes are for 1/4”
screws/anchors (not provided).
1. Review drawing set for general arrangement provided within the system enclosure.
2. Install sieve beds:
a) The sieve beds are part of the sub-assembly, FPS-00900-Reliable-03, but will be shipped
separately
b) Sieve beds will come pre-assembled with mounting brackets for placing into the
Reliable
®
cabinet. Brackets are designed for Qty. Six 1/4”-20 bolts, not included. See General
Arrangement for location of holes.
c) They should be placed in the cabinet
one sieve bed at a time. They are marked “
bed A
”
and “
bed B
.” Bed A should be on the left facing the cabinet.
d) The lower bracket is slotted so that the sieve bed may be set down on top of the fastener
for ease of installation.
e) Once the bed is set on the lower fastener, the top bracket should be secured in place using
both mounting holes in the bracket.
f)
Once the upper brackets are secured firmly in place, secure the lower bracket with a nut,
wing nut, or similar fastener.
3. Assemble nitrogen output fittings on sieve beds:
a) The nitrogen output fittings are part of FPS-00900-Reliable-03 sieve bed assembly, but are
shipped loose as a sub-assembly.
b) Locate the sub-assembly to place on top of the sieve bed assembly.
c) The sub-assembly terminates in two metal stem push to connect fittings on each side.
d) The sub-assembly should be firmly placed into the top of the sieve bed which has female
push to connect fittings to receive the stems. The stems should “snap” into place and hold
securely.
e) Test that the fittings are secure before moving forward.
4. Install nitrogen storage tank:
a) The nitrogen storage tank, FPS-00900-Reliable-04, will come pre-assembled with all
necessary fittings.
b) The tank will need to be placed in the Reliable cabinet and secured in place with four (4)
fasteners, not included.