background image

BrewBlast™ 70CPH O&M                                                              

 

 

         

    South-Tek Systems 

        

15 

 

If your  system requirements are more  complex, please consult your  sales  representative or  equipment installer for 
more detailed installation instructions. 

1.

 

The BrewBlast

™ BrewBlast™ 70CPH

 

is supplied with 

½” NPT female inlet and outlet fittings.   Make sure to use 

Teflon tape or similar on all fittings so they do not leak. 

2.

 

Connect the BrewBlast

™ BrewBlast™ 70CPH

 

to the storage tank and then to the coffee system. 

3.

 

Once  connections  are  made,  slowly  open  the  syst

em’s On/Off Valve. 

A.

 

You  will  hear  air  rushing  through  the  system  and  N

filling  the  BrewBlast

™  BrewBlast™  70CPH 

storage tank. 

B.

 

If you hear a leak or have a bad connection, shut the valve off and make the correction. 

C.

 

If  there  is  a  leak  within  the  unit,  remove  the  cover  and  locate  the  issue.  If  you  have  to replace  any 
parts,  use  only  factory  parts  supplied  from  your  distributor  or  South-Tek  Systems.  Consult  the 
manufacturer if there are any questions. 

4.

 

Once the BrewBlast

™ BrewBlast™ 70CPH fills the storage tank to 85 PSIG, the system will enter standby – the 

system’s green N2 Production light will change to orange indicating that the system is in standby. This will  shut  
the  air  flow  off  through  the  generator  and  eventually  shut  off  the  air compressor once it reaches  the air 
tank cutout pressure. 

A.

 

This will prolong the life of your compressor

’s motor. 

B.

 

This also prolongs the life of the nitrogen generator

’s media and filter. 

i.

 

Lesser  quality  systems  have  a  constant  purge  flow  through  their  systems  which  decreases 
system life and increases the need for maintenance. 

5.

 

When  you  draw  N

off  the  system  and  the  tank  pressure  falls  below  cut-in  pressure  (approximately  62 

PSIG),  the  pressure  switch  will  trigger  the  system  back  into  run  mode  and  start  recharging  the  storage  tank 
automatically. The pressure switch is preset at the factory 

– no field adjustment is required. 

4.7

 

CHECKING FOR LEAKS 

When a leak is suspected, first try to listen for leaks around the connection ports. If a leak is found, isolate the area 
so  that  there  is  no  pressure  on  it.  Fix  the  leaking  part  and  return  the  system  back  to operation.  If  no  leak  can  be 
heard, turn off the unit and try isolating sections to see if there is 

a pressure loss. If the BlastOff™ option is included 

with  your  unit,  the  system  will  alarm  indicating  that  there  is  a  leak  in  the  line.  Consult  with  your  installer  if  you 
cannot locate the leakage area. 

 

To determine if the leak is within the cabinet: 

A.

 

With the unit powered on, close off all output gas. If no ball valve is installed on the output ports, it is 
recommended to remove the gas lines and install a plug. 

B.

 

Allow the system to continue running. Within 1 h

our, the system should reach the “Standby” mode. 

C.

 

Wait for 5 minutes 

and if the system remains in the “standby” mode, then the leak is after this point. 

Check the gas lines exterior to the cabinet all the way back to the keg system.  

D.

 

If the unit goes back into “run” mode, the leak is within the cabinet. Check all the lines  going to the 
blender and back to the tank. 
 

To find the leak within the cabinet: 

1.

 

Open the front cabinet door and locate the N

2

 storage tank. 

2.

 

Close off the output ball valve from the tank (upper ball valve on the red manifold). 

3.

 

Watch  the  exterior  gauge  above  the  cabinet  for  60  seconds.  If  you  see  the  pressure  dropping,  the 
leak is somewhere between the output ports, to the blender (if one is present), and back to the closed 
off  ball  valve  on  the  tank.  Fill  and/or  listen  for  leaks  and  fix  them  once  found.  If  the  pressure  is  not 
dropping, go to the next step. 

4.

 

With  the  unit  still  running,  close  off  the  input  ball  valve  to  the  tank  (lower  ball  valve  on  the  red 
manifold).  

5.

 

Within  5  minutes,  the  system  should  go  into 

“Standby”  Mode.    If  it  doesn’t,  contact  your  local 

provider/installer for further assistance. 

Содержание 70CPH

Страница 1: ...The Leader in Nitrogen Generation Technology 70CPH Operation and Installation Manual Version 0 05 30 2019 2020...

Страница 2: ...BrewBlast 70CPH O M South Tek Systems 2 VERSION HISTORY Revision Implemented By Revision Date Approved By Approval Date Reason 0 M Thomas 05 30 19 A Norman 05 30 19 Initial Release...

Страница 3: ...t 70CPH 8 4 2 Electrical Requirements 8 4 3 Mounting BrewBlast 70CPH 8 4 4 Installation BrewBlast 70CPH 10 4 5 Nitrogen Cylinder Back Up BrewBlast 70CPH 14 4 6 Start Up Procedures BrewBlast 70CPH 14 4...

Страница 4: ...BrewBlast 70CPH O M South Tek Systems 4 Notes...

Страница 5: ...ce the unit ensure the power switch has been turned to the off position then disconnect the unit s external power cord from the building electrical power supply if possible When servicing your system...

Страница 6: ...rforming any electrical work NOTE Always following local and site safety regulations in conjunction with this manual Warning This manual must be read in its entirety prior to installing and operating...

Страница 7: ...e system in a Standby Mode when the tank is full of Nitrogen McDantimTM Dual Output Gas Blender optional Precisely blends N2 with CO2 from the restaurant bar s in house storage cylinder tank The avail...

Страница 8: ...been read completely and all connections are made as stated within Keep all gas lines dry so that moisture does not enter the generator upon hookup Never place or stack objects on top of the BrewBlas...

Страница 9: ...inet in comparison to the wall a Use the supplied nuts and bolts to attach the upper 12 bracket onto the top flange per the diagram b Use the supplied carriage bolts and nuts to attach the 18 lower br...

Страница 10: ...gas to all of the beverage lines Use only quality beverage tubing and fittings for all connections Keep in mind the temperature and pressure requirements when selecting them Always install a valve on...

Страница 11: ...It is the responsibility of the installer to plumb these drains to an area where standing water is trapped or a drain is located Failure to do so can cause a slipping hazard on the floor below the ge...

Страница 12: ...BrewBlast 70CPH O M South Tek Systems 12...

Страница 13: ...BrewBlast 70CPH O M South Tek Systems 13 Optional Separate N2 Storage Tank Setup...

Страница 14: ...em is turned on the backup will fill the N2 Storage tank and flow to the BrewBlast 70CPH keeping the internal blender pressurized with Nitrogen See below for visual piping connections 4 6 START UP PRO...

Страница 15: ...ally The pressure switch is preset at the factory no field adjustment is required 4 7 CHECKING FOR LEAKS When a leak is suspected first try to listen for leaks around the connection ports If a leak is...

Страница 16: ...mperature and line temperatures are maintained otherwise you will not be able to effectively push coffee from the keg Please consult with your local distributor for questions not answered in this manu...

Страница 17: ...ilter bowls until the filter is completely depressurized 1 Disconnect the clear blue drain tubes from the bottom of the bowls 2 To remove the bowl turn the metal casing around the blue plastic filter...

Страница 18: ...the filter bracket to keep track of when the filter was replaced last 10 Put the front cover back on the cabinet and the unit can be powered up again Once powered up you should hear the air compressor...

Страница 19: ...BrewBlast 70CPH O M South Tek Systems 19...

Страница 20: ...have the blender option check the CO2 regulator pressure gauge It should read between 80 and 100 psig If it is lower check the CO2 Storage tank to see if it needs refilling or if the pressure regulato...

Страница 21: ...s received with defects that are not due to shipping a written claim should be submitted to South Tek Systems within 1 week of receiving the shipment South Tek Systems can deny all other claims at the...

Страница 22: ...BrewBlast 70CPH O M South Tek Systems 22 Last Page...