16
Notes
• The molding on the front pillar will be
fastened in place with clips or screws.
When removing it, take care not to
damage or deform it.
• When performing the installation
yourself, if you decide it is too difficult
to remove the front pillar molding,
please contact your dealer for
assistance. (Note that your dealer may
charge a fee for their assistance.)
Film antenna mounting procedure
1
Check the film antenna
qf
mounting position.
1
Align the film antenna power supply point with the lower
edge of the window’s ceramic line and fasten temporarily
in place with cellophane tape.
Do not remove the adhesive backing from the antenna yet.
The figure below shows the results of this step, for the left
antenna. Temporarily position the right antenna in the
same manner.
2
Mark the left and right sides of the film antenna, using
cellophane tape, etc.
2
Remove the inner molding from the front pillars on
both sides of the front window.
(The above figure shows an example of a car, such as a sedan
or SUV, which as a handle mounted on the front pillar.)
About 120 mm
Power supply point
Ceramic line
Align the
upper edge of
the antenna
with this line.
Temporary fastener
(cellophane tape, etc.)
marking (cellophane tape, etc.)
Front pillar
Содержание XTL-W7000
Страница 34: ...12 拆卸機架 安裝本機之前 請拆卸本機的機架 1 將兩把解鎖鑰匙 qa 一起插入本機和機架 8 中直到聽 到喀嗒聲 2 拉下機架 8 然後向上拉本機使其分離 8 qa 將掛勾朝內 m ...
Страница 35: ...13 安裝過程 安裝示例 當安裝本機時 務必關閉本機的顯示器 在安裝時如果顯示器打開且用力過度 可能發生故障 1 2 3 182 mm 53 mm 腳爪 儀表板 8 8 9 防火壁 0 qs ...
Страница 46: ......
Страница 47: ......