2-3
UP-895/(E)
2-3-2. Removal of MA-99 Board
1.
Remove the top cover. (Refer to Section 2-2.)
4 CN7
6 MA-99 board
4 CN2
4 CN12
5 Tapping screws (M3)
5 Tapping
screws (M3)
4 CN14
4 CN1
4 CN8
4 CN13
4 CN3
4 CN9
4 Screws
(PS 3
x
6)
4 Screws (PS 3
x
6)
1 Tapping
screw (M3)
1 Tapping screw
(M3)
3 CN201
6 Switching
regulator
2 Sheeld plate
1 Tapping
screws
(M3)
3 Rear panel
2 Screw
(BTP 3
x
8)
2-3-3. Removal of Switching Regulator
1.
Remove the top cover. (Refer to Section 2-2.)
2.
Remove the front panel, door panel and power switch
rod. (Refer to Section 2-3-1.)
3.
Remove the MA-99 board. (Refer to Section 2-3-2.)
Содержание UP-895
Страница 1: ...VIDEO GRAPHIC PRINTER UP 895 UP 895CE UP 895MD SERVICE MANUAL 1st Edition ...
Страница 6: ......
Страница 26: ......
Страница 52: ......
Страница 71: ...10 1 UP 895 E 10 1 2 3 4 5 1 A B C D E F G H Section 10 Schematic Diagrams and Board Layouts ...
Страница 82: ......