1-2 (E)
NSS-S2
1-2. Installation Procedure
n
Keep the packing materials, such as carton, cushion, and so
on after unpacking.
When the unit is transported, pack the unit using the
supplied materials.
The following flowchart shows the installation procedure
of this unit.
Refer to each item in this manual for details.
1-3. Operating Conditions and
Installation Space
1. Set the operating temperature and humidity
within the following conditions.
Operating temperature
+
5
d
C to
+
40
d
C
Operating humidity
+
20 % to
+
90 %
(No condensation)
Storage temperature
_
20
d
C to
+
60
d
C
2. Do not install this unit in the following
locations.
.
Areas where the unit will be exposed to direct
sunlight or any other strong lights
.
Dusty areas or areas where is subjected to vibration
.
Areas with strong electric or magnetic fields
.
Areas near heat sources
.
Areas where is subjected to electrical noise
.
Areas where is subjected to static electricity noise
.
Unstable and unbalanced areas
3. To prevent the internal temperature rise, pay
attention to circulation of air in the place
where this unit is installed.
The rear side of this unit should be 10 cm away from
the walls for ventilation.
Start
Determination
of installation place
Switch setting
Rack mounting
Installing the
HDD unit
Connection
Checks after connection
End
1-3. Operating Conditions
and Installation Space
1-4. Power Supply
1-5.
Setting the Switch for
the Backup Battery
1-6. Rack Mounting
1-7. Installing the HDD Unit
1-8. Signal Input and Output
1-9. Connecting Connectors
and Cables
1-10. Connection
1-11. Checks after Connection
Содержание NSS-S2
Страница 1: ...MEDIA STORAGE UNIT NSS S2 INSTALLATION MANUAL 1st Edition Revised 1 Serial No 10001 and Higher ...
Страница 6: ......
Страница 8: ......
Страница 38: ......
Страница 40: ...Printed in Japan Sony Corporation 2006 12 16 2005 NSS S2 SY J E 3 903 855 02 ...