12
HCD-VP700
2-12. BASE UNIT, BD BOARD
4
Turn the pulley to the direction of arrow.
pulley
Base unit
qg
qd
Two screws (+PTPWH M2.6)
5
Screw (+PTPWH M2.6)
1
Pulley(B)(BU-30), chucking
2
Two Screws (+PTPWH M2.6)
3
Lever (lifter)
qf
Screw (DIA. 12)
qa
Two screws (+BVTP 2.6
×
8)
q;
BD board
qh
Two insulators
6
Holder assy
qh
Two insulators
qs
Two stoppers
7
Flat type wire (CN101)
8
Flat type wire (CN102)
9
Remove the solder
(four portions).
Spring (insulator), coil
Spring (insulator),
coil
Spring
(insulator),
coil
Содержание HCD-VP700
Страница 16: ...16 HCD VP700 MEMO ...