TAV-L1
34
3-19. LEVER (LOADING-L/R)
2
two hooks
4
two hooks
BOTTOM VIEW
3
lever (loading-L)
5
lever (loading-R)
SPT-T (loading-R)
SPR-T (loading-L)
1
1
PRECAUTION DURING LEVER (LOADING R / L) INSTALLATION
lever (loading-R)
Align the horizontal position.
lever (loading-L)
Install the
both levers so that they move symmetrically.
chassis (top)
Содержание Esprit TAV-L1
Страница 10: ...10 TAV L1 MAIN board MAIN BOARD SERVICE POSITION ...
Страница 46: ...46 TAV L1 MEMO ...
Страница 209: ...209 TAV L1 MEMO ...