36
HCD-HPZ7/HPZ9
2-43. PLATE (PUSH) ASSY
1
SPR-E (plate-push-back)
3
SPR-E (plate-push-back)
2
screw (PTPWH M2)
3
gear (tako second)
4
gear (tako second)
4
four claws
2
four claws
5
Remove the plate (push) assy
in the direction of the arrow.
1
Remove the plate (push) assy
in the direction of the arrow.
PRECAUTION DURING GEAR (TAKO SECOND) INSTALLATION
gear (tako second)
Adjust phases.
5
Adjust phases.
plate (push) assy
plate (push) assy