30
HCD-HPZ7/HPZ9
2-33. LEVER (LOADING R, LOADING L)
lever (loading R)
Align the horizontal position.
lever (loading L)
Install the
both levers so that they move symmetrically.
3
two hooks
5
two hooks
4
lever (loading L)
6
lever (loading R),
gear (IDL-G),
gear (IDL-H)
SPR-T (loading L)
SPR-T (loading R)
1
2
PRECAUTION DURING LEVER (LOADING R/L) INSTALLATION