background image

2-5 (E)

BDX-E1000

2-4. BDKP-E1004/E1005 Installation

Either BDKP-E1004 (SCR-4 board) or BDKP-E1005

(SCR-5 board) can be installed on the SY-240 board which

has board suffix -13 and higher.

Installation procedures

1.

Remove the SY-240 board from the BDX-E1000.

(Refer to the Section 2-1.)

2.

Fix the two PCB holders supplied with the BDKP-

E1004/E1005 to the SY-240 board.

3.

Match the connectors CN301 and CN302 on the SCR-

4/5 board with the connectors CN901 and CN902 on

the SY-240 board.

4.

Connect the connectors on the SCR-4/5 board to the

connectors on the SY-240 board while inserting the

PCB holders through the holes on the SCR-4/5 board.

n

Make sure that the connectors are connected tightly.

5.

Insert the SY-240 board into the Slot No.4.  (Refer to

the Section 2-1.)

6.

Install the board retainer with the four screws.

7.

Close the front panel.

8.

Tighten the locking screw.

Confirmation after installation

There is no necessity to confirm/adjust after SCR-4/5

board installing.

SY-240 board

PCB holders

2-4. BDKP-E1004/E1005 Installation

SY-240 board

SCR-4/5 board

CN902

CN302

CN301

CN901

PCB holder

PCB holder

Содержание BDKP-E1002

Страница 1: ...MPEG ENCODER UNIT BDX E1000 AUDIO INPUT BOARD BDKP E1002 4 2 2 PROFILE UPGRADE BOARD BDKP E1003 SCRAMBLER BOARD BDKP E1004 SCRAMBLER BOARD BDKP E1005 INSTALLATION MANUAL 1st Edition Revised 4 ...

Страница 2: ...bei Wartungsarbeiten strikt die Angaben in der Anleitung zu befolgen Andere als die angegeben Wartungsarbeiten dürfen nur von Personen ausgeführt werden die eine spezielle Befähigung dazu besitzen AVERTISSEMENT Ce manual est destiné uniquement aux personnes compétentes en charge de l entretien Afin de réduire les risques de décharge électrique d incendie ou de blessure n effectuer que les réparati...

Страница 3: ...upplied power from an outlet on the rack please confirm that the outlet is provided with a suitable protective earth connection 3 Internal air ambient temperature of the rack When this product is installed in a rack please make sure that the internal air ambient temperature of the rack is within the specified limit of this product 4 Prevention against achieving hazardous condition due to uneven me...

Страница 4: ......

Страница 5: ...s 1 8 E 1 7 1 APR 25 Board 1 8 E 1 7 2 ENC 40 Board 1 9 E 1 7 3 SY 240 Board 1 10 E 1 7 4 VPR 33 Board 1 12 E 1 7 5 IO 158 Board 1 13 E 1 8 Setting of Resume Function 1 13 E 1 9 Setting for Color Frame Information Transmission 1 14 E 2 Installation of Optional Boards 2 1 General Information for Installation 2 1 E 2 2 BDKP E1002 Installation 2 2 E 2 3 BDKP E1003 Installation 2 4 E 2 4 BDKP E1004 E1...

Страница 6: ......

Страница 7: ...upplied with the BDX E1000 This manual describes information that premise the service based on parts replace ment adjustments board layouts schematic diagrams parts list etc and infor mation that premise the service based on block and board replacement If this manual is required contact your local Sony Sales Office Service Center Contents The following is a summary of all the sections for understa...

Страница 8: ......

Страница 9: ... E1000 The voltage within the range of 100 V to 240 V can be used without changing the supply voltage n As the inrush current at turn on is maximum 20 A at 100 V maximum 40 A at 240 V the capacity of the AC power must be adequate with the inrush current of maximum 20 A at 100 V maximum 40 A at 240 V If the capacity of the AC power is not the adequately large the breaker of the AC power at the supp...

Страница 10: ... on the rear panel considering that the BDX E1000 is pulled out An installation manual is supplied with the RMM 30 rack mount rail However follow the instructions in this manual Because the rack mounting procedures of the BDX E1000 are different from the procedures explained in RMM 30 installation manual Be sure to fix the rack to the floor with bolts This will prevent the rack from falling when t...

Страница 11: ...sed the BDX E1000 may be dropped by insufficient strength of the rack mount rail This may cause a injury Procedures 1 Turn the power off 2 Remove the four feet from the bottom of the BDX E1000 Feet BVTT 3 12 Feet BVTT 3 12 3 While pressing the stopper of the rail pull out the inner rail 4 Attach the inner rails to the BDX E1000 using the six screws B4 X 8 supplied with the BDX E1000 5 Loosen the s...

Страница 12: ... moved smoothly tighten the screws B5 X 8 secured temporarily in the step 6 n When securing the front brackets to the rack by screws pull out the BDX E1000 about 20 cm 8 inches and fasten the screws of the front brackets to the rack 9 After installing the BDX E1000 in the rack secure the unit to the rack by the prepared four screws RK5 X 16 and four washers n When the BDX E1000 is mounted in a rac...

Страница 13: ...2 CLOCK INPUT OUTPUT BIT STREAM I O D sub 25 pin male 1 566 356 11 PARALLEL BIT STREAM I O Half pitch 50 pin Pin type male SPARE AUDIO INPUT XLR 3 pin male 1 508 084 00 3 CH1 CH2 CH3 CH4 TIME CODE INPUT MONITOR OUTPUT XLR 3 pin female 1 508 083 00 4 R L CONTROL RJ45 modular jack 5 10BASE T CONTROL D sub 9 pin male 1 560 651 00 Connector RS 232C 1 561 749 00 Shell AUX INPUT 1 INPUT 2 1 It is recomm...

Страница 14: ...stem GND 16 Data 7 B 17 Data 6 B 18 Data 5 B 19 Data 4 B 20 Data 3 B 21 Data 2 B 22 Data 1 B 23 Data 0 B 24 DVALID B Data valid B 25 PSYNC B Packet sync B 2 SPARE Half pitch 50 pin Pin type Pin No Signal 1 GND 2 GND 3 GND 4 GND 5 GND 6 GND 7 GND 8 GND 9 GND 10 GND 11 GND 12 RESERVED 13 OPEN 14 RESERVED 15 GND 16 GND 17 GND 18 GND 19 GND 20 GND 21 GND 22 GND 23 GND 24 GND 25 GND 26 DB 0 27 DB 1 28 ...

Страница 15: ... pin Pin No Signal 1 SG 2 RTS 3 RTS 4 RXD 5 TXD 6 CTS 7 CTS 8 TXD 9 RXD 8 1 External view 5 1 9 6 Female External view 5 1 9 6 Female External view Pin No Signal 36 GND 37 RESERVED 38 TERMPWR 39 RESERVED 40 GND 41 ATN 42 GND 43 BSY 44 ACK 45 RST 46 MSG 47 SEL 48 C D 49 REQ 50 I O 3 CONTROL 10BASE T 8 pin Modular jack Pin No Signal 1 TXD 2 TXD 3 RXD 4 5 6 RXD 7 8 ...

Страница 16: ...ut LCH RCH respectively Reference level 4 dBm 0 dBm _ _ _ _ _3 dBm _ _ _ _ _20 dBm LCH S532 E 10 4 0 _3 _20 4 RCH S632 D 10 4 0 _3 _20 4 n When the factory setting is changed perform the adjust ment in accordance with 2 3 APR 25 Board Adjustment in the Maintence Manual S531 S631 OUTPUT HEADROOM select switches Select the headroom of the monitor output LCH RCH respectively Headroom 20 dB 18 dB 16 d...

Страница 17: ...ring the digital input AES EBU or SDI selection Lights up Exists a input Blinks Detects a over level Lights off No input The correspondence of the indicator and the channel are as follows D917 D918 D919 D920 D921 D922 D923 D924 CH1 CH2 CH3 CH4 CH5 CH6 CH7 CH8 1 7 2 ENC 40 Board n The addresses on the board are shown by marks Switch S1401 A 9 Factory use only Factory setting All switch levers are s...

Страница 18: ...s this switch in normal times S102 A 4 Factory use only Factory setting All switch levers are set to OFF n Be sure to use this switch with factory setting S201 1 A 3 STARTING CONTROL select switch Selects either starting of the encoder is controlled by a host computer or by using resume function By selecting the resume function when power is turned on the encoder starts it s operation according to...

Страница 19: ... the display of the indicator D209 D110 A 5 green LAN RECEIVED indicator Lights up when data is received in the ethernet port D111 A 5 green LAN TRANSMITTED indicator Lights up when data is transmitted to the ethernet port D201 to D208 A 2 orange Factory use only D209 A 6 STATUS indicator 7 segment LED During the normal operation displays the bit rates of the video signal Unit Mbps When the indica...

Страница 20: ... board are shown by marks Switch S1 A 4 Factory use only Factory setting All switch levers are set to OPEN upper position n Be sure to use this switch with factory setting Indicator D13 A 3 green HOST LOCAL indicator Lights up The VPR 33 board is controlled form the host SY 240 board During the normal operation Lights off The VPR 33 board operates in local During the factory use D14 A 2 green REFE...

Страница 21: ...starts according to the setting mode which was set in advance by the optional encoding setup software BZX E1001 n Resume function operates on the serial number 10091 and higher Procedures 1 Turn the power off 2 Set the switches on the SY 240 board as follows S201 1 to 7 CLOSE lower position S202 0 The setting of S201 8 varies by the selected mode 3 Install the BZX E1001 on the computer connected t...

Страница 22: ...ansmission The BDX E1000 can transmit the color frame information of input video signal to the BDX D1000 MPEG Decoder Unit n The transmission of the color frame information is possible with the BDX E1000 of a serial number 20001 and higher Procedures For details refer to the User s Guide of the optional BZX E1001 Encoding Setup Software 1 Install the BZX E1001 on the computer connected to the BDX ...

Страница 23: ... SCR 5 board is installed on the SY 240 board the bit stream can be scrambled by DES system n Either BDKP E1004 SCR 4 board or BDKP E1005 SCR 5 board can be installed on the SY 240 board Removal procedure of plug in board 1 Turn the power off 2 Unplug the appliance from the outlet 3 Loosen the locking screw on the front panel using a flat blade screwdriver 4 Pull the locking screw toward you and o...

Страница 24: ...d tightly 5 Insert the APR 25 board into the Slot No 3 Refer to the Section 2 1 6 Install the board retainer with the four screws 7 Close the front panel 8 Tighten the locking screw Confirmation after installation n In this section describes the DVR 2000 2100 4 2 2 Component Digital VTR is an example as the equipment which has the SDI output CH5 to CH8 capability Perform the following confirmation...

Страница 25: ...u operation refer to the operation manual of the DVR 2000 2100 3 Put S102 4 on the SY 240 board to ON 4 Check that the AES EBU input signals are output from the monitor output connectors normally Switch settings SY 240 board S201 1 6 OPEN upper position S202 2 Audio Monitor CH5 6 3 Audio Monitor CH7 8 Press the S101 The setting of S201 8 varies by the selected video input mode CLOSE 525 60 Hz NTSC...

Страница 26: ...tors CN1 and CN2 on the DEC 106 board with the connectors CN1 and CN2 on the ENC 40 board 4 Connect the connectors on the DEC 106 board to the connectors on the ENC 40 board while inserting the PCB holders through the holes on the DEC 106 board n Make sure that the connectors are connected tightly 5 Insert the ENC 40 board into the Slot No 1 Refer to the Section 2 1 6 Install the board retainer wi...

Страница 27: ...nd CN902 on the SY 240 board 4 Connect the connectors on the SCR 4 5 board to the connectors on the SY 240 board while inserting the PCB holders through the holes on the SCR 4 5 board n Make sure that the connectors are connected tightly 5 Insert the SY 240 board into the Slot No 4 Refer to the Section 2 1 6 Install the board retainer with the four screws 7 Close the front panel 8 Tighten the lock...

Страница 28: ......

Страница 29: ...perature inside the unit getting rise This may cause a fire 1 Turn the power off 2 Loosen the locking screw on the front panel using a flat blade screwdriver 3 Pull the locking screw toward you and open the front panel 4 Peel the filter away from the tape 5 Clean the dust on the filter using a vacuum cleaner n If the filter is too much dusty it is recommended to wash it When washing the filter be ...

Страница 30: ...efer to 1 4 2 Fan Motor Replacement in the Maintenance Manual 3 2 Periodic Replacement Lithium battery For data backup a lithium battery is installed on the SY 240 board of the BDX E1000 It is recommended to replace the lithium battery every two years If the lithium battery run down the indicator D105 on the SY 240 board lights up In this case replace the lithium battery B101 immediately For the r...

Страница 31: ...erial number ROM version 3 3 2 Usage of ISR Functions The ISR function is controlled by Sony application program software For the program software usage installation and opera tion of a personal computer in which this program software can be used contact your local Sony Sales Office Service Center The preparation below is required when managing the BDX E1000 by ISR 1 Connect a personal computer to...

Страница 32: ...8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 3 2 7 8 6 5 1 4 9 Information of ISR Connector Prepare a cable referred to the following connection In case of direct connection with a personal computer DB9 PC BDX DB9 Signal Signal FG TXD RXD RTS CTS DSR SG DCD DTR NC FG TXD RXD RTS CTS DSR SG DCD DTR NC 3 2 7 8 6 5 1 4 9 3 2 7 8 6 5 1 4 9 3 3 ISR Interactive Status Reporting ...

Страница 33: ...N Terminal Server 6 pin port n The connection will change according to the maker of terminal server RJ12 Modular type Terminal Server BDX DB9 RTS TXD SG NC RXD CTS FG TXD RXD RTS CTS DSR SG DCD DTR NC 1 2 3 4 5 6 3 2 7 8 6 5 1 4 9 3 3 ISR Interactive Status Reporting ...

Страница 34: ...OR Replace the fan motor 200 VPR 33 BOARD ERROR Replace the VPR 33 board 201 ENC 40 BOARD ERROR Replace the ENC 40 board 202 APR 25 BOARD ERROR Replace the APR 25 APR 93 board n For the fan motor replacement procedures refer to 1 4 2 Fan Motor Replacement in the Maintenance Manual For the each boards replacement procedures refer to 1 5 1 Plug in Boards Replacement in the Maintenance Manual ...

Страница 35: ... de Sony Corporation Sony Corporation interdit formellement la copie de quelque partie que ce soit de ce manuel ou son emploi pour tout autre but que des opérations ou entretiens de l équipement à moins d une permission écrite de Sony Corporation Das in dieser Anleitung enthaltene Material besteht aus Informationen die Eigentum der Sony Corporation sind Die Sony Corporation untersagt ausdrücklich ...

Страница 36: ...Printed in Japan Sony Corporation 1999 4 11 Broadcasting Professional Systems Company 1996 BDX E1000 SY BDKP E1002 SY BDKP E1003 SY BDKP E1004 SY BDKP E1005 SY J E 3 190 952 05 ...

Отзывы: