24
GB
Controller / electrical connections
Note:
−
Work on live parts must be carried out by an autho-
rised specialist!
−
Fusing, wiring and earthing must be executed in ac-
cordance with the local regulations.
−
The electrical connection to the mains network must
be realised using the clamped power cable.
−
The solar controller must be protected from surge
damage.
−
The controller only needs to be opened for service
work. Ensure that the power supply has been discon-
nected before opening the solar controller housing!
Pump cables, power cable and tank sensor are connected
to the controller ex-works.
Caution!
Do not severely bend or place the cable under tension!
Do not guide the cable over sharp edged components.
The cable must not come into contact with hot parts!
(For functional description and operation see separate
Controller Manual).
Содержание 131220
Страница 17: ...D 17...
Страница 33: ...GB 33...
Страница 49: ...I 49...
Страница 65: ...F 65...
Страница 81: ...E 81...
Страница 97: ...PT 97...
Страница 112: ...112 DK Tryktab og l fteh jde HKM20 HKM20HE HKM20HE O UPS 15 60 L fteh jde HKM20 Alpha2 L fteh jde HKM20...
Страница 113: ...113...
Страница 114: ...114...
Страница 115: ...115...