![Sonnenkraft 131220 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/sonnenkraft/131220/131220_manual_1321813021.webp)
GB
21
Installation on the tank
Screw in threaded pins [13] for station fastening
on the tank.
Hang station on threaded pin and fasten with nut.
Hydraulically connect station with corrugated pipe [10]
and seals [9] to the tank.
Caution!
Counterhold when tightening the union nuts.
Put cable clip onto the mixer on the side. Guide all cables
upward to the SLM and press into the cable clip.
Содержание 131220
Страница 17: ...D 17...
Страница 33: ...GB 33...
Страница 49: ...I 49...
Страница 65: ...F 65...
Страница 81: ...E 81...
Страница 97: ...PT 97...
Страница 112: ...112 DK Tryktab og l fteh jde HKM20 HKM20HE HKM20HE O UPS 15 60 L fteh jde HKM20 Alpha2 L fteh jde HKM20...
Страница 113: ...113...
Страница 114: ...114...
Страница 115: ...115...