6 | Electrical installation
28 / 60
Installation instructions sonnenBatterie eco 9.43
The following points must be observed when connecting power meters:
3
1
2
7
8
9
A1 A2
13 14 15 16
5
4
1 2 3
6
3
2
1 2 3
10
3
1
2
11
12
1
13
Illustration 21: Power meter components
• Never confuse inputs A1 and A2!
• The lines connected to the voltage
measurement terminal strip (3) must be
protected by suitable miniature circuit
breakers. Additional miniature circuit
breakers do not have to be installed if
the lines are already protected in ac-
cordance to the relevant, currently ap-
plicable regulations and standards.
1
A1 – input for generation
8
Current transformer for generation - L2
2
A2 – input for consumption
9
Current transformer for generation - L3
3
Voltage measurement terminal strip
10
Transformer interface for consumption
4
Power meter
11
Current transformer for consumption -
L1
5
Modbus terminal strip
12
Current transformer for consumption -
L2
6
Transformer interface for generation 13
Current transformer for consumption -
L3
7
Current transformer for generation -
L1
A1 A2
13 14 15 16
N L1 L2L3
3~
N L
1~
13 14 15 16
13 14 15 16
Illustration 22: Connection to the voltage ter-
minal strip at single-phase (1~) and three-
phase (3~) mains
• The connection to the voltage terminal
strip depends on the number of phases.
In the case of a single-phase (1~) mains,
the voltage terminal strip must be wired
like it is shown on the bottom part of
the figure on the left. In case of a
three-phase (3~) mains wire as shown
on the top part of the figure.