4
Note:
The device can be used in rainy conditions,
however at user’s own responsibility. It is
recommended to use gauntlets.
2
Measurements
2.1 Tester operation control
Before each operation of the tester, its func-
tioning must be checked:
•
Test the voltage indicator using a known volt-
age source,
•
Short-circuit the measurement probes – there
should be a sound signal, the LED diode
Ω
should be lit and there should be the
legend in the display.
Notes:
The voltage indication function is active
whether the batteries are charged or not. Other
functions require charged batteries.
2.2 AC or DC voltage test
Содержание P-3
Страница 1: ......
Страница 2: ......
Страница 10: ...8 2 8 1 Without transmitter ...
Страница 13: ...11 2 8 2 2 Correct work of the P 3 indicator with the LKN 710P transmitter ...
Страница 19: ......
Страница 20: ......