PRE-INSTALLATION CHECKS
STEP 3
1
Before installation, it is recommended the ROVNav 6 is checked for operation.
1
Check the Pressure Relief Vent Valve is flush with the end-cap. If the valve is found
to be protruding refer to the ROVNav 6 User Manual UM-8310 for instructions on
releasing the internal pressure.
1
Electric shock hazard risk if the Remote Transducer output connector contacts are
touched whilst the transducer cable is disconnected, the unit is powered and if
instructed to transmit. Never touch the connector contacts whilst the power is on.
WARNING
2
Remove the protective cover from the Remote Transducer 4-Way AGP connection .
3
Using the Remote Transducer 4-Way AGP cable (312-8044) connect the Remote
Transducer to the Remote Transducer 4-Way AGP connection on the ROVNav
6.
2
3
3
2
3
Содержание 6G ROVNAV 6
Страница 14: ......