
17
UDT MODELS:
1.
Cut a hole in the top of the table as shown on the drawing (If not done by table
manufacturer).
2.
Center the provided UDT Adapter beneath the opening and weld it into place as shown.
Please follow print detail for welding instructions (if not done by table manufacturer).
3.
Put the Pulper into position.
4.
Place the anti-vibration pads under each leg of the Pulper and Hydra-
Extractor
®
.
5.
Adjust the Pulper and Hydra-Extractor
®
legs so that the unit sits level and the rubber UDT
gasket provides a watertight seal with 2” clearance between Pulper top and the
underside of the table.
6.
Install the provided trough gasket between the Pulpers inlet and the trough outlet and
secure with the provided hardware. Holes will need to be drilled in the field
7.
Trim UDT Rubber Gasket to fit tightly around the pulper lid.
Содержание SPC-50S
Страница 12: ...12 Installation ...
Страница 15: ...15 OPTIONAL EQUIPMENT 1 Remote Push Button Station 2 Trough Magnet Hardware 3 Tray Feed Hood 1 2 3 ...
Страница 23: ...23 Start Up ...
Страница 26: ...26 Operation ...
Страница 31: ...31 CLEANING YOUR SYSTEM ...
Страница 34: ...34 MAINTENANCE ...
Страница 43: ...43 TROUBLESHOOTING ...
Страница 47: ...47 Display Module Instructions ...
Страница 52: ...52 165 Independence Ct Lancaster Pa 17601 Ph 800 237 6628 service somatcompany com ...