19
/
46
3.2 Installation spacing
In order to ensure good ventilation of the energy storage integrated machine,
please reserve enough installation spacing around the machine during
installation.
Position
Min spacing
Remark
Side spacing
100cm
Back spacing
10cm
It needs to be installed against the wall
Note
: For detailed requirements about the narrowest maintenance channel, escape
route, etc., refer to the applicable standards of the country/ region where the project
is located.
Содержание S12 NA Series
Страница 1: ...1 46 User Manual Home Energy Storage System Soluna S12 NA Mar 2020 Revision A 0...
Страница 15: ...15 46 2 6 Appearance Figure 2 3 Appearance Number Name Remark Soluna brand LCD panel...
Страница 17: ...17 46 Figure2 5 Appearance Number Name Remark Door lock of system Door Key...
Страница 18: ...18 46 3 Installation 3 1 Installation tools...
Страница 35: ...35 46 Figure 4 5 PV information Figure 4 6 Load information...
Страница 36: ...36 46 Figure 4 7 Grid information Figure 4 8 Battery information...
Страница 38: ...38 46 Figure 4 11 Charging setting 1 Figure 4 12 Charging setting 2 Figure 4 13 Charging setting 3...