background image

 

 

15K Pack HV Installation Manual 

© 2020 Soluna Australia Pty Ltd 

Page 24 of 25 

Published date: November 2020 

 

 

 

 

 

 

5.

 

Care and maintenance 

Keep the area around the BS clear of debris. 
 
The Soluna 15K Pack HV BS does not require pre-scheduled preventative maintenance – it is 
not designed to be opened. The unit will be replaced if a failure is diagnosed. 
 

Firmware upgrade 

To upgrade the BS firmware, the following are required. 

§

 

Laptop (with USB port) 

§

 

CAN box 

§

 

System password 

 
The following steps should be followed to upgrade the BS firmware (call 1300 126 888 for the 
username and password (installer only) if required). 

1)

 

Turn on the power – the power indicator will be lit. 

2)

 

Plug one side of the CAN box into the CAN 2 port, the other side into the laptop. 

3)

 

Open the file labelled ‘Soluna BMS monitor’. 

4)

 

In the ‘Username’ field, enter '*****”. 

5)

 

In the ‘Password’ field, enter “*****”. 

6)

 

Click ‘Log in’. 

7)

 

In the upper left-hand corner, click ‘CAN converter setup’. 

8)

 

Click ‘Turn on the device’. 

9)

 

When connected, the screen will show ‘BMS successful handshake’. 

10)

 

Click ‘Firmware upgrade’. 

11)

 

Open the file, choose ‘15K BMS’ then click ‘Automatically reset’ after download. 

12)

 

Click ‘Start downloading’. 

13)

 

The installation of the firmware is complete when ‘Download successful’ appears. 

14)

 

If there are any issues, please contact Soluna Australia on 1300 126 888. 

 

Содержание 15K PACK HV

Страница 1: ...2020 Soluna Australia Pty Ltd Page 1 of 25 Published date November 2020 Installation Manual Lithium Battery Pack SOLUNA 15K Pack HV Suitable for indoor installation Soluna Australia Pty Ltd ACN 634 9...

Страница 2: ...fo soluna com au The information included in this manual is accurate at the time of publication However with respect to product design and technical specification updates Soluna Australia reserves the...

Страница 3: ...BS 8 Packing list 9 Installation materials 9 Installation location 9 Installation tools 9 Outline dimensions mm 11 Technical data 12 Appearance 13 Wiring port 14 3 Installation________________________...

Страница 4: ...hat battery polarity is observed and that the BS is connected correctly Keep the BS away from an open flame or sources of ignition Keep children and animals away from the BS Read the manual in its ent...

Страница 5: ...ight 4 Do not allow the BS connectors to touch conductive objects such as wires Risks of electric shock 1 Do not disassemble the BS 2 Do not touch the BS with wet hands 3 Do not expose the BS to moist...

Страница 6: ...the leaked substance 8 If ingestion does occur induce vomiting and seek medical attention immediately Fire Always keep an ABC or carbon dioxide fire extinguisher nearby in case of fire The BS may cat...

Страница 7: ...ed installer only that is a trained and qualified electrician with the following skills and experience 1 Knowledge of the functional principles and operation of on grid systems 2 Knowledge of the dang...

Страница 8: ...er temperature protection functions It is characterised by high energy density long life safety and reliability and is environmentally sustainable Features 1 Excellent safety performance 2 Long cycle...

Страница 9: ...ire 1 Installation materials Installers should prepare the following installation materials 1 Charging cables 2 Network cables Installation location Ensure that the installation location meets the fol...

Страница 10: ...2020 Item Photo Name 1 Phillips screwdriver bit 2 Network crimper 3 Wire cutter 4 Wire stripper 5 Tape measure All tools should be properly insulated to prevent an accidental electric shock or short c...

Страница 11: ...tallation Manual 2020 Soluna Australia Pty Ltd Page 11 of 25 Published date November 2020 Outline dimensions mm Figure 2 1 outline dimensions Depth Width Width mm 654 2 Depth mm 227 2 Height mm 1205 3...

Страница 12: ...rge current A 30 30 Charge discharge power nominal kW 6 Max charge discharge power kW 10 DoD 80 Cycle life 3600 Battery pack round trip efficiency 95 DC disconnect Contactor fuse BMS Power consumption...

Страница 13: ...tion Manual 2020 Soluna Australia Pty Ltd Page 13 of 25 Published date November 2020 Appearance Figure 2 2 appearance Number Name Remark Cable entry Power ON OFF Upper handle Lower handle Grounding Gr...

Страница 14: ...November 2020 Wiring port The wiring port of the Soluna 15K PACK HV can be seen once the cover cap has been opened see diagram below for details Figure 2 3 Wiring port Number Name Remark CAN1 port Fo...

Страница 15: ...ce of 200 cm in all directions around the BS Position Minimum spacing cm Remark Side spacing 100 Allow clearance of at least 100 cm on either side of the BS Above 40 Nothing should be placed on top of...

Страница 16: ...ring specification To standardise the BS wiring specification the following are required to connect the wires Battery wire Communication cable Use of an 8 AWG conductor with double insulation is recom...

Страница 17: ...communication interface CAN 1 and CAN 2 Figure 3 1 CAN interface definition CAN 1 port for external communication 1 2 3 4 5 6 7 8 CAN 1H CAN 1L CAN 2 port for internal communication 1 2 3 4 5 6 7 8 CA...

Страница 18: ...15K Pack HV Installation Manual 2020 Soluna Australia Pty Ltd Page 18 of 25 Published date November 2020 Electrical connection Please refer to the following for details Preparation...

Страница 19: ...procedures Step 2 Create the power cables Crimp the connector OT6 5 Bind with insulating tape Step 1 Connect the earth cable ideally the earth terminal and cable should be fastened with an M6 screw Te...

Страница 20: ...Page 20 of 25 Published date November 2020 Step 3 Lock power cables and communication cable Step 4 Lock the cover Remove communication cable from accessory box and plug in Lock power cable with a Phi...

Страница 21: ...15K Pack HV Installation Manual 2020 Soluna Australia Pty Ltd Page 21 of 25 Published date November 2020...

Страница 22: ...ation wire 2 Connect the inverter and the DC port of the BS with wires 3 Turn on the breaker on the right side of the BS 4 To shut down switch off the breaker 4 Consumer Start up and Shut down procedu...

Страница 23: ...15K Pack HV Installation Manual 2020 Soluna Australia Pty Ltd Page 23 of 25 Published date November 2020...

Страница 24: ...the username and password installer only if required 1 Turn on the power the power indicator will be lit 2 Plug one side of the CAN box into the CAN 2 port the other side into the laptop 3 Open the f...

Страница 25: ...it enters a warning state When a warning is reported the inverter immediately ceases operation The monitoring software on the inverter can be used to identify the cause of the warning Possible warning...

Отзывы: