15K Pack HV Installation Manual
© 2020 Soluna Australia Pty Ltd
Page 16 of 25
Published date: November 2020
Installation requirements
The Soluna 15K Pack HV should be installed against a wall, with eight holes drilled into that
wall to fix the racks of the BS. See the following diagram for details.
Wiring specification
To standardise the BS wiring specification, the following are required to connect the wires.
Battery wire
Communication cable
Use of an 8 AWG conductor with
double insulation is recommended.
Use of standard communication cable with a shielding function
is recommended.
Earth connection specification
Step 1: drill holes in the wall.
Step 3: install the battery module.
Connect the front plate to the housing.
Connect the earth wire at this location.
Step 2: screw the bracket to the wall