
25
6.3
Overview of the Connection Area
Position
Designation
a
Grid Connector
b
EPS Output
c
PV Inputs
d
DC Switch (optional)
e
MULTI Port (for Meter & Other Communications)
f
BMS Port
g
DRM Port
h
EMS Port (for WiFi Stick or other EMS Controllers)
i
Battery Connectors
j
Additional Grounding Point
6.4
PV Connection
Please only use the PV connectors from the accessory box for
connection.
Before connecting, please make sure:
•
The voltage, current and power ratings of the panels to be
connected are within the allowable range of the inverter.
Ensure polarity is correct. Please refer to the Technical Data in
chapter 9 for voltage and current limits.
a b
c
d
e
f
g
h
i
j
Содержание AIO2-INS Series
Страница 1: ...Operating Manual AIO2 INS Series...
Страница 2: ...1 Version DM AIO2 INS EN 1 1...
Страница 22: ...19 STEP 2 Install the hanger with 6 M8 60 inner hexagonal expansion screws as shown in the picture to the right...
Страница 25: ...22...
Страница 27: ...24 6 2 Wiring Diagram Wiring Diagram for Europe...
Страница 47: ...44...