
15
STEP 2:
Install the hanger with 5
M8-60 inner hexagonal
expansion screws, as
shown in the picture to
the right.
STEP 3:
Hang the battery on the
hanger. Note: Make sure
that the four hooks of the
hanger are all engaged,
otherwise it will not be
strong enough.
STEP 4:
Install the outer frame of
the wiring area.
Place the frame of the
wiring area on the
battery, align the outer
frame, and screw the
three M5-10 stainless steel
Phillips head screws into
the three holes marked
by the arrows.
Содержание AIO2-INS Series
Страница 1: ...Operating Manual AIO2 INS Series...
Страница 2: ...1 Version DM AIO2 INS EN 1 1...
Страница 22: ...19 STEP 2 Install the hanger with 6 M8 60 inner hexagonal expansion screws as shown in the picture to the right...
Страница 25: ...22...
Страница 27: ...24 6 2 Wiring Diagram Wiring Diagram for Europe...
Страница 47: ...44...