  32                                        User  Manual  UM0007_ASW3000-5000H-S_EN_V01_0321     

 

Conductor 

cross-

section 

Maximum cable length 

ASW3000

H-S 

ASW3680

H-S 

ASW4000

H-S 

ASW5000

H-S 

2.5 mm² 

46m 

37 m 

28 m 

17 m 

4 mm² 

74 m 

59 m 

44 m 

28 m 

6 mm² 

110 m 

89 m 

67 m 

42 m 

The required conductor cross-section depends on the inverter 
rating, ambient temperature, routing method, cable type, cable 
losses, applicable installation requirements of the country of 
installation, etc. 

Residual current protection 

The product is equipped with an integrated universal current-
sensitive residual current monitoring unit inside. The inverter will 
disconnect immediately from the mains power as soon as fault 
current with a value exceeding the limit. 

 

Overvoltage category 

The inverter can be used in grids of overvoltage category III or 
lower in accordance with IEC 60664-1. This means that it can be 
permanently connected at the grid-connection point in a building. 
In installations involving long outdoor cable routing, additional 
measures to reduce overvoltage category IV to overvoltage 
category III are required. 

AC circuit breaker 

 

If an external residual-current device is required, install a type 
B residual-current device which trips at a residual current of 
100 mA or higher. 

Содержание ASW H-S Series

Страница 1: ......

Страница 2: ...manual 6 2 Safety 8 2 1 Intended use 8 2 2 Important safety information 9 2 3 Symbols on the label 12 3 Unpacking 14 3 1 Scope of delivery 14 3 2 Checking for transport damage 15 4 Mounting 15 4 1 Re...

Страница 3: ...6 5 EPS connection 37 6 6 Second protective grounding connection 39 6 7 DC Connection 40 6 7 1 Requirements for the DC Connection 40 6 7 2 Assembling the DC connectors 41 6 7 3 Connecting the PV array...

Страница 4: ...meter set up 61 8 4 2 AIHOME initialization set up 61 8 4 3 Starting conditions of different modes 62 8 4 4 Description of working state 62 9 Display 64 9 1 Overview of the panel 64 9 1 1 LEDs 65 10...

Страница 5: ...ture ASW3680H S 83 11 8 3 Power reduction with increased ambient temperature ASW4000H S 84 11 8 4 Power reduction with increased ambient temperature ASW5000H S 85 11 9 Tools and torque 86 12 Troublesh...

Страница 6: ...oads will be supported in priority by the system then battery power exceed consumption power will be drained from grid inverter It can provide power for emergency use during the grid lost by using the...

Страница 7: ...ust have the following skills Knowledge of how an inverter works and is operated Training in how to deal with the dangers and risks associated with installing repairing and using electrical devices an...

Страница 8: ...can result in death or serious injury CAUTION indicates a hazardous situation which if not be avoided can result in minor or moderate injury NOTICE indicates a situation which if not be avoided can re...

Страница 9: ...When the PV modules are exposed to sunlight a DC voltage is supplied to this inverter 6 When designing the PV system ensure that the values comply with the permitted operating range of all components...

Страница 10: ...ion Danger to life due to electric shock when live components or cables are touched All work on the inverter must only be carried out by qualified personnel who have read and fully understood all safe...

Страница 11: ...ated cable ends Do not touch the DC conductors Do not touch any live components of the inverter Have the inverter mounted installed and commissioned only by qualified persons with the appropriate skil...

Страница 12: ...s Do not place metallic tools and similar metallic parts on the batteries Switch off load connected to the batteries before dismantling battery connection terminals Risk of burns due to hot enclosure...

Страница 13: ...arried out by skilled and authorized electricians Beware of hot surfaces The inverter can get hot during operation Avoid contact during operation WEEE designation Do not dispose of the product togethe...

Страница 14: ...discharge Before opening the covers the inverter must be disconnected from the grid and PV array Wait at least 5 minutes to allow the energy storage capacitors to fully discharge Observe the documenta...

Страница 15: ...mounting bracket 1 piece C Documentation 1 set D Smart meter terminal 1 piece E Magnetic ring 1 piece F Antenna 1 piece G DC connector 2 pairs H Screw accessory 1 set I AC connector 2 pieces J Battery...

Страница 16: ...talled out of the reach of children 2 To ensure best operating status and prolonged service life the mounting ambient temperature of the inverter should be 45 C 3 To avoid direct sunlight rain snow po...

Страница 17: ...e to be mounted on solid wall that is vertical or tilted backwards Max 15 It is not recommended to install the inverter on the wall made of plasterboards or similar materials The inverter may make noi...

Страница 18: ...isk of injury when lifting the inverter or if it is dropped The weight of Solplanet inverter is max 21 5 kg There is risk of injury if the inverter is lifted incorrectly or dropped while being transpo...

Страница 19: ...ing bracket Risk of injury due to damaged cables There may be power cables or other supply lines e g gas or water routed in the wall Ensure that no lines are laid in the wall which could be damaged wh...

Страница 20: ...SW10 3 Hang the inverter to the wall mounting bracket Secure the inverter to the wall mounting bracket on both sides using M5 screws Screwdriver type PH2 torque 2 5Nm 4 To protect the inverter from t...

Страница 21: ...e hybrid inverter applicable to on grid PV systems With the integrated Energy Management System EMS they can control and optimize the energy flow in order to increase the self consumption of the syste...

Страница 22: ...ovoltaic power generation B inveter energy conversion C batter Energy storage D meter Grid energy control E GRID Public power grid F Back up load Uninterrupted power equipment G Normal load General el...

Страница 23: ...elf Consumption Backup Force time use Custom Off grid If mode switching is in operation please stop the inverter first 5 3 1 Self Consumption The photovoltaic energy is preferentially used by local lo...

Страница 24: ...power is too large first from the photovoltaic energy and then battery discharge and finally use the power grid 1 In the morning the photovoltaic energy is insufficient and the load is powered by PV...

Страница 25: ...ery as a backup power supply always keep sufficient energy power supply to the load when GRID failure Load priority batter load GRID When the photovoltaic energy is enough first charge the battery the...

Страница 26: ...ID failure as a backup power supply to the load 1 Photovoltaic priority to charge the battery 2 Under normal conditions the battery does not discharge Even at night 3 When there is a GRID failure the...

Страница 27: ...Users can manage the energy according to their own needs and set the daily regular charging and discharging on the app Other time follow the Self Consumption mode 5 3 4 Off GRID The inverter operates...

Страница 28: ...nect the DC connectors from the inverter under load an electric arc may occur leading to electric shock and burns Do not touch non insulated cable ends Do not touch the DC conductors Do not touch any...

Страница 29: ...tring to isolate the DC side of the inverter We recommend the following electrical connection Risk of injury due to electric shock The inverter must be installed only by trained and authorized electri...

Страница 30: ...User Manual UM_ASW3000 5000H S_EN_V01_0321 29 DC BOX optional AC BOX DC INPUT AC OUTPUT To Grid TO grounding electrode PE L N PE INVERTER Second grounding L PE N 6 3 Overview of the connection area...

Страница 31: ...nnector 6 4 AC connection 6 4 1 Conditions for the AC connection Cable Requirements The grid connection is established using three conductors L N and PE We recommend the following specifications for s...

Страница 32: ...AC cable approx 53 mm The PE conductor must be 2mm longer than the L and N conductors Larger cross sections should be used for longer cables Cable design The conductor cross section should be dimensi...

Страница 33: ...rent sensitive residual current monitoring unit inside The inverter will disconnect immediately from the mains power as soon as fault current with a value exceeding the limit Overvoltage category The...

Страница 34: ...f exposed to heat The maximum output current and the maximum output overcurrent protection of the inverters can be found in section 10 Technical data Grounding conductor monitoring The inverter is equ...

Страница 35: ...wing measures Connect a copper wire grounding conductor with a cross section of at least 10 mm to the AC connector bush insert Connect an additional grounding that has at least the same cross section...

Страница 36: ...o the corresponding terminals and tighten the screw with a accompanied Torx screwdriver TX 8 torque 1 4Nm Ensure that all conductors are securely in place in the screw terminals on the bush insert Ass...

Страница 37: ...36 User Manual UM0007_ASW3000 5000H S_EN_V01_0321 5 Plug the AC connector into the jack for the AC connection and screw tight...

Страница 38: ...local and national rules Make sure that all DC switches and AC circuit breakers have been disconnected before establishing electrical connection Otherwise the high voltage within the inverter may lead...

Страница 39: ...adapter to the socket element stuff the sealing sleeve into the adapter and tighten the swivel nut 3 Plug the AC connector into the socket for the EPS connection Object Description Value A External d...

Страница 40: ...he grounding conductor on the AC connector fails Procedure 1 Insert the grounding conductor into the suitable terminal lug and crimp the contact 2 Align the terminal lug with the grounding conductor 3...

Страница 41: ...age of the PV array must never exceed the maximum input voltage of the inverter The connection cables of the PV modules must be equipped with the connectors included in the scope of delivery The posit...

Страница 42: ...LA or USE2 and comply with the following properties External diameter 5 8mm Conductor cross section 2 5 6mm Qty single wires minimum 7 Nominal voltage minimum 1000V 1 DC cable requirements as follows...

Страница 43: ...ng bracket down until it audibly snaps into place 4 Ensure that the cable is correctly positioned Result Measure If the stranded wires are visible in the chamber of the clamping bracket the cable is c...

Страница 44: ...ng bracket and lever it open Remove the cable and go back to step 2 5 Push the swivel nut up to the thread and tighten torque 2 Nm 6 Insert DC plug connectors into corresponding DC input connectors on...

Страница 45: ...C connector must be reassembled again The DC cable must always have the same polarity as the DC connector 5 Ensure that the open circuit voltage of the PV strings does not exceed the maximum DC input...

Страница 46: ...erter due to moisture and dust penetration Seal the unused DC inputs with sealing plugs so that moisture and dust cannot penetrate the Inverter Make sure all DC connectors are securely sealed Danger t...

Страница 47: ...t a flat blade screwdriver blade width 3 5 mm into the side catch mechanism and lever open 3 Carefully pull the DC connector apart 4 Release the clamping bracket To do so insert a flat blade screwdriv...

Страница 48: ...e electric power Batteries deliver electric power resulting in burns or a fire hazard when they are short circuited or wrongly installed Lead acid batteries are not allowed The lithium battery pack mu...

Страница 49: ...he battery terminal cover Screwdriver type T30 or SW10 torque 4 0Nm 3 Tighten the battery terminal cover and cable gland nuts Screwdriver type PH2 torque 1 6Nm Object Description Value A External diam...

Страница 50: ...onnected to the wrong port The port distribution is as follows Danger to life due to electric shock when live components are touched Disconnect the inverter from all voltage sources before connect the...

Страница 51: ...tion plate remove the sealing plug and lead the stripped cable through the swivel nut sealing sleeve communication plate and magnetic ring crimp the crystal as below pin assignment 3 Insert the cystal...

Страница 52: ...ble connection Procedure 1 Remove the communication plate 2 Loosen the swivel nut of the cable gland on the communication plate remove the sealing plug and lead the cable through the swivel nut sealin...

Страница 53: ...ghten the swivel nut Screwdriver type PH2 torque 1 6Nm 6 9 4 Smart meter cable connection Connection diagram Procedure 1 Smart meter communication 1 Cable requirements are as follows Insert the conduc...

Страница 54: ...eve communication plate and magnetic ring press the latch of the smart meter terminal and insert the conductors accordingly Make sure the cable is connected firmly 4 Insert the smart meter terminal to...

Страница 55: ...54 User Manual UM0007_ASW3000 5000H S_EN_V01_0321 6 9 5 WiFi antenna connection Take off the sealing cap and tighten the antenna to inverter...

Страница 56: ...integration The connection diagram between the inverter and internet with a WLAN connection is shown as follows We offer a remote monitoring app called AiHome You can install the AiHome application o...

Страница 57: ...consume at more than 75 of rated power AND Source reactive power if capable DRM 4 Increase power consumption subject to constraints from other active DRMs DRM 5 Do not generate power DRM 6 Do not gen...

Страница 58: ...arth Fault Alarm This inverter complies with IEC 62109 2 clause 13 9 for earth fault alarm monitoring If an Earth Fault Alarm occurs the red color LED indicator will light up and the buzzer of the inv...

Страница 59: ...about designing the PV system for the maximum allowed DC voltage Check the polarity of the DC voltage make sure the DC voltage has the correct polarity Check the PV array s insulation to ground with...

Страница 60: ...rect polarity Check the battery communication connection Check the battery BMS communication cable connection is normal Check the meter connection Ensure that the meter is connected according to the m...

Страница 61: ...communication cable and AC connector have been correctly wired and tightened 8 3 Safety code check Choose suitable safety code according to the location of installation please visit website http www a...

Страница 62: ...1 Smart meter set up It is necessary to set the communication format of smart meter to 8N1 and baud rate to 9600 For smart meter settings please refer to the smart meter manual 8 4 2 AiHome initializ...

Страница 63: ...the requirements of each mode When the initial voltage of the strings is greater than the minimum DC input voltage but lower than the start up DC input voltage batter voltage lower than the start up...

Страница 64: ...periods of low radiation the inverter may continuously start up and shut down This is due to insufficient power generated by the PV array If this fault occurs often please call service If the inverter...

Страница 65: ...rs 9 1 Overview of the panel The inverter is equipped with five LEDs indicators Object Funct ion Diagram LED Description A SOL AR ON PV active BLINK Self check Soft upgrade OFF PV not active B BAT ON...

Страница 66: ...ctive and connected WHITE BLINK Grid is active Forced off grid RED ON Grid fault OFF Inverter shutdown 9 1 1 LEDs The inverter is equipped with five LED indicators white white yellow red white red and...

Страница 67: ...The red LED is lit When the inverter is faluty The ERR LED always off when the inverter is operating normally EPS LED The white LED is lit when the EPS is operating normally on load The white LED is f...

Страница 68: ...ctric shock when touching exposed DC conductors or DC plug contacts if the DC connectors are damaged or loose The DC connectors can break or become damaged become free of the DC cables or no longer be...

Страница 69: ...e width 3 5 mm into one of the slide slots and pull the DC connectors out downwards Do not pull on the cable 6 Release and disconnect the AC connector Rotate the socket element counter clockwise to op...

Страница 70: ...array power STC 5500Wp 6180Wp 6500Wp 7500Wp Max input voltage 550V MPP voltage range 100V 530V Rated input voltage 380V Initial feeding in voltage 125V Min feed in power 20W Max input current per MPP...

Страница 71: ...0321 11 2 Batter input data Type ASW3000 H S ASW3680 H S ASW4000 H S ASW5000 H S Nominal battery voltage 48V Battery voltage range 40V 60V Max charging power 2500W Max discharging power 2500W Max char...

Страница 72: ...apparent AC power 3000VA 3680VA 4000VA 5000VA Nominal AC voltage range 220V 230V 180V 280V AC power frequency range 50 60 5Hz Rated power frequency rate d grid voltage 50Hz 230V Max output current 13...

Страница 73: ...5000H S_EN_V01_0321 Adjustable displacement power factor 0 95 inductive 0 95 capacitive only for VDE AR N 4105 0 8 inductive 0 8 capacitive for others Feed in phase connection phase 1 1 Harmonic dist...

Страница 74: ...data Type ASW300 0H S ASW368 0H S ASW400 0H S ASW500 0H S Max output apparent power 2500VA Peak output apparent power 3500VA 10s Nominal output voltage 230V Nominal output frequency 50Hz 60Hz Max outp...

Страница 75: ...ower output Via connecting Smart meter Dimensions W x H x D mm 494 x 420x 195 Weight 21 5Kg Cooling concept convection Noise emission typical 25 dB A 1m Installation indoor outdoor Mounting informatio...

Страница 76: ...ng to IEC 60529 IP65 Climatic category according to IEC 60721 3 4 4K4H Topology No Isolated Self consumption night 10W Communication interfaces WiFi Radio technology WLAN 802 11 b g n Radio spectrum W...

Страница 77: ...ring GFCI function Earth Fault Alarm cloud based audible and visible AU Protection class according to IEC 62103 overvoltage category according to IEC 60664 1 II DC III AC Internal overvoltage protecti...

Страница 78: ...to the standardized power output Pac Pac r according to EN 50524 VDE 0126 13 2008 10 cl 4 5 3 Notes Values are based on rated grid voltage cos phi 1 and an ambient temperature of 25 Efficiency curve A...

Страница 79: ...00H S_EN_V01_0321 Efficiency curve ASW3680H S Efficiency Max efficiency European weighted efficiency 97 3 96 6 MPPT efficiency 99 9 86 00 88 00 90 00 92 00 94 00 96 00 98 00 0 1000 2000 3000 4000 ASW3...

Страница 80: ..._V01_0321 79 Efficiency curve ASW4000H S Efficiency Max efficiency European weighted efficiency 97 2 96 4 MPPT efficiency 99 9 86 00 88 00 90 00 92 00 94 00 96 00 98 00 0 1000 2000 3000 4000 5000 ASW4...

Страница 81: ...Efficiency curve ASW5000H S Efficiency Max efficiency European weighted efficiency 97 3 96 8 MPPT efficiency 99 9 88 00 89 00 90 00 91 00 92 00 93 00 94 00 95 00 96 00 97 00 98 00 0 1000 2000 3000 40...

Страница 82: ...01_0321 81 Discharge Efficiency curve ASW3000H S ASW3680H S ASW4000H S ASW5000H S Efficiency MAX efficiency 94 83 50 00 55 00 60 00 65 00 70 00 75 00 80 00 85 00 90 00 95 00 100 00 0 500 1000 1500 200...

Страница 83: ...ding ambient temperature and input voltage grid voltage grid frequency and power available from the PV modules This device can decrease power output during certain periods of the day according to thes...

Страница 84: ...User Manual UM_ASW3000 5000H S_EN_V01_0321 83 11 8 2 Power reduction with increased ambient temperature ASW3680H S 0 500 1000 1500 2000 2500 3000 3500 4000 30 35 40 45 50 55 60 65 ASW3680H S derating...

Страница 85: ...ser Manual UM0007_ASW3000 5000H S_EN_V01_0321 11 8 3 Power reduction with increased ambient temperature ASW4000H S 0 500 1000 1500 2000 2500 3000 3500 4000 4500 30 35 40 45 50 55 60 65 ASW4000H S dera...

Страница 86: ...n with increased ambient temperature ASW5000H S 0 1000 2000 3000 4000 5000 6000 25 30 35 40 45 50 55 60 65 ASW5000H S derating 330V 380V 500V The power reduction curve is tested at normal air pressure...

Страница 87: ...ective grounding connection 1 6Nm Screws for connecting the inverter and wall bracket Flat head screwdriver blade with 3 5mm Sunclix DC connector Flat head screwdriver blade 0 4 2 5 Smart meter connec...

Страница 88: ...s Cable cutter Cut power cables Multimeter Check electrical connection Marker Mark the positions of drill holes ESD glove Wear ESD glove when opening the inverter Safety goggle Wear safety goggle duri...

Страница 89: ...rings and make sure it is below the maximum DC input voltage of the inverter If the input voltage is within the permitted range and the fault still occurs it might be that the internal circuit has bro...

Страница 90: ...C cable grid connection on the inverter If this fault is still being shown contact the service 36 Make sure the grounding connection of the inverter is reliable Make a visual inspection of all PV cabl...

Страница 91: ...47 Disconnect the inverter from the grid and the PV array and reconnect after 3 minutes If this fault is still being shown contact the service 61 62 Check the DRED device communication or operation 65...

Страница 92: ...User Manual UM_ASW3000 5000H S_EN_V01_0321 91 6 8 9 Contact the service if you meet other problems not in the table...

Страница 93: ...ntacts of the DC switch annually Perform cleaning by cycling the switch to on and off positions 5 times The DC switch is located at the lower left of the enclosure 13 2 Cleaning the heat sink Clean th...

Страница 94: ...romagnetic compatibility 2014 30 EU L 96 79 106 March 29 2014 EMC Low Voltage Directive 2014 35 EU L 96 357 374 March 29 2014 LVD Radio Equipment Directive 2014 53 EU L 153 62 106 May 22 2014 RED AISW...

Страница 95: ...vice during the warranty period the customer must provide a copy of the invoice factory warranty card and ensure the electrical label of the inverter is legible If these conditions are not met AISWEI...

Страница 96: ...tact us Add No 198 Xiangyang Road Suzhou 215011 China AISWEI Pty Ltd Hotline 61 390 988 673 Service email service au aiswei tech com Add Level 40 140 William Street Melbourne VIC 3000 Australia AISWEI...

Страница 97: ......

Отзывы: