
24
101 Metro Plaza • Suite 315 • San Jose, CA 95110 •
(800) 801-4186
© 2020 SolPad Inc
.
Battery Max Customers with AC Coupled Batteries
These installations require three pairs of CT’s. One set of CT’s measures the utility. One set
measures the dedicated loads (during an outage). One set measures the solar production.
CT’s measuring the utility will land in the terminals for MOTE 1.
CT’s measuring back-up (battery power) flowing to the dedicated loads sub-panel will land
on the terminals for MOTE 2.
CT’s measuring solar production will land on the terminals for MOTE 3.