3.
Installation
These instructions are intended only as GENERAL GUIDELINES to be used in conjunction with
local and national electrical and building codes. This unit should be installed and serviced by
qualified persons only. Install the system in 6 steps. Steps 3 - 5 can be performed
simultaneously, or in any order, however step 6 cannot be completed until after they are all
complete.
Installation Steps
1.
Mount the enclosure
2.
Source power for the system
3.
Connectivity and Accessories
4.
Installation of Current Transducers (CTs)
5.
Connecting Devices to be Controlled
6.
Power Up the Load Controller
7.
System Verification, Test and Turn-up
The Installation technician will be required to supply some of the items necessary to
complete the installation as noted in the “Recommended Material” and Recommended
Tools sections.
**IMPORTANT NOTE: This Energy Management System is to be installed by a
professional electrician.
3.1
Mounting the Enclosure
Choose where to mount the enclosure.
The Enclosure is best mounted near:
The Source of Power
Where the CTs will be installed - Main Grid Power, Dedicated Loads, and Solar
Power CTs
Where devices to be controlled - Devices are typically intercepted for control at the
breaker panels but will sometimes require wire going to the device location.
The enclosure has four holes pre-drilled for mounting and should be used to secure the
enclosure according to local code and with the appropriate fasteners based on site
conditions.