6. Operation
Monthly Energy
Main interface
information
settings
advanced info.
advanced settings
UP/DOWN
UP/DOWN
UP/DOWN
Pressing the ENTER
key to switch
to the submenu
Pressing the ESC
key calls back
the previous menu
main menu
Figure 6.1 Operation Overview
ESC
ESC
ENTER
6.1 Initial Display
When powering up the inverter for the first time, it is required to set the language.
Press "ENT" to select.
Figure 6.2 Set Language
Settings
Set
Language
2015-02-23 19 35
English
中文
Y E S
=
< E N T >
N O
=
< E S C >
E S C
U P
D O W N
E N T
5. Commissioning
5.3 Shutdown procedure
1. Turn off the AC isolator at the grid connection point.
2. Turn off the DC switch of the inverter.
3. Turn off the DC switch between inverter and battery.
4. Waiting for the LCD of inverter to turn off and the system shutdown is completed.
.44.
.43.