
Appendix F – Stagebox Installation
Page 67
Appendix F: Additional Information for Installing Stageboxes
When positioning and installing a C-SB the following rules must be followed:
• Unobstructed airflow at front and rear.
• No obstruction to airflow, horizontally or vertically, within 300mm in front, above and below both the front and rear
panels.
• Ambient temperature no more than 30˚C measured at the air intake (lower front opening) or just below the rear
heatsink.
• Microphone cables must not obstruct the air intake. To help ensure this, a cable guide is provided down the sides of
the rack.
Design Requirements for a Flightcase
If a Stagebox is to be installed into a flight case the following requirements, in addition to those above, must be met to
ensure adequate passive cooling – otherwise user must install a ‘forced-ventilation kit’ option.
• Both front and rear covers must be completely removed during operation.
• The front and rear covers must be deep enough to ensure that the front and rear faces of Stagebox are flush with
front and rear of the open flight case.
Содержание C300 HD
Страница 1: ...Installation Guide ...
Страница 2: ...C300HD Installation Guide ...
Страница 70: ...C300HD Installation Guide Page 66 4dBu 1 229V rms 0dBu 0 775V rms 6dBu 0 388V rms ...
Страница 74: ...C300HD Installation Guide Page 70 volume of a sphere 4 π r 3 3 ...
Страница 76: ...C300HD Installation Guide Page 72 Notes ...