Page 12 of 24
Installation instructions – Wooden frame collectors
In-roof installation
INSTALLATION OF THE
INTEGRATION COVER:
(25)
At the bottom of each collector, by the centre of the
collector, mount the wooden slats with 2 4x80mm
screws for each one of them.
Advice:
The slat’s upper face must be, at the highest, at the
level of the upper edge of the collector’s frame.
(26)
Mount the wooden wedge meant to shelter the
hydraulic connections. This wedge is located at the top
of the collectors and is fastened by Torx 4x80mm
screws.
Be very careful not to damage the connections while
fastening.
(27)
On the left hand side collector, place the frame’s lower
corner. It is inserted in the runner located all around
the collectors and must be tucked up till it’s complete
contact with the slat previously installed.
(28)
Fasten this front corner section to the slat using sealed
plumbing nails.
Installing the collectors - page 13
Technical changes may be made without notice