Communication Connection Steps:
Ø
Step3.
Assemble the cable gland and screw the cable nut.
Step4
. Insert one RJ45 side of the cable into BMS port inside of inverter and the
other side into RS485 or Can port of the battery.
Step1.
Disassemble the GEN/Meter/BMS cable gland.
Step2.
Prepare a communication cable(without sheath) and insert the commu-
nication cable through the cable nut.
Step1,2
Step3
Step4
6.5 Earth Connection(mandatory)
User can addtionally earth the inverter to the enclosure of a second earthing or
equipotential bonding if it is required by local safety. This prevents electric shock
if the original protective conductor fails.
Earth Connection Steps:
Ø
Step2.
Place the ring terminal into the earthing rod and screw the earthing screw
tightly.
Step1
. Strip the earthing cable insulation and insert the stripped cable into the
ring terminal, then clamp it .
Electrical Connection
Electrical Connection
32
33
Cable size: 12AWG.
ring terminal
Step1
Step2
BMS Port: The
first
RJ45 port from right side
The seal is used for waterproof. Please
make sure it has been kept back.
Содержание X3-Hybrid
Страница 37: ......