![SolaX Power T-BAT H11.2 Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/solax-power/t-bat-h11-2/t-bat-h11-2_manual_1314349017.webp)
INSTALLATION
3. Communication Line Connection
RS485 Connection
: Connecting communication line (Length: 120mm) between BMS RS485 port
and Battery Module’s RS485I port, then tighten the plastic nut. If more than one battery module (2
-4
Battery Modules),
after finishing the communication connection between BMS and First battery
module
, using Communication Line (Length: 400mm) to complete the communication connection
between battery modules.
Содержание T-BAT H11.2
Страница 1: ...Triple Power High Voltage Storage System www solaxpower com...
Страница 2: ...CONTENTS 1 3 4 OVERVIEW INTRODUCTION CERTIFICATION INSTALLATION STATUS INDICATOR TROUBLESHOOTING...
Страница 11: ...INSTALLATION Design Sketch...
Страница 12: ...INSTALLATION Complete Installation Drawing...
Страница 16: ...INSTALLATION 2 Power Line Connection Actual Connection Diagram...
Страница 24: ...STATUS INDICATOR BMS Status Indicator Charge Discharge 60 Power...
Страница 27: ...Thank you...