![SolaX Power T-BAT H11.2 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/solax-power/t-bat-h11-2/t-bat-h11-2_manual_1314349013.webp)
INSTALLATION
1. Floor/Wall Mounting
Note
:
•
Customers are supposed to
estimate the GND wire first
according to their actual
installation site;
•
Then connect GND wire with
battery module;
•
Then start installing: floor
mounting or Wall mounting;
•
Lastly, connect power line &
Communication line between
BMS and battery module;
Содержание T-BAT H11.2
Страница 1: ...Triple Power High Voltage Storage System www solaxpower com...
Страница 2: ...CONTENTS 1 3 4 OVERVIEW INTRODUCTION CERTIFICATION INSTALLATION STATUS INDICATOR TROUBLESHOOTING...
Страница 11: ...INSTALLATION Design Sketch...
Страница 12: ...INSTALLATION Complete Installation Drawing...
Страница 16: ...INSTALLATION 2 Power Line Connection Actual Connection Diagram...
Страница 24: ...STATUS INDICATOR BMS Status Indicator Charge Discharge 60 Power...
Страница 27: ...Thank you...