6.4 Preparation
Below tools are needed before installation.
Installation Tools
Installation Tools: crimping pliers for binding post and RJ45, screwdriver, manual
wrench,
ф
6 driller and rubber hammer.
The unit is heavy. Do not lift it alone.
Lifting and Handling
• During lifting procedures ensure that the unit is firmly secured to avoid the risk
of accidental tipping or dropping.
• Parts serving for support or immobilization of unit shall be designed and
manufactured so as to minimize the risk of physical injuries and of accidental
loosening of fixing.
• Ensure that the method of lifting will not allow the unit to slip from chains and
slings or turn-over or slide from lifting devices.
• Transportation must be carried by specialized person (truck operators. Hook-up
personal), equipped with the necessary protection equipments (overalls, safety
shoes, protective gloves, helmets, goggles)
• Do not walk or stand beneath or in the proximity of the load.
• Avoid sudden movements and jolts when unloading and positioning the unit.
Internal handling procedures must be conducted with care. Do not exert
leverage on the components of the machine.
• If the unit is not balanced apply ballast. Any protruding parts should not be
supported by hand.
• The inverter should be installed so that the operating panel shall be easily
accessible- easy access to the electrical power connection point.
• Accessible for maintenance and repair work.
• Parts serving for support or immobilization of unit shall be designed and
manufactured so as to minimize the risk of physical injuries and accidental
loosening of fixings.
• Loading capacity and hardness of the supporting surface, load rating of
mounting bracket should be at least four times the weight of the devices
according to IEC62109-1. and supporting characteristics will be impaired by
wear, corrosion, material fatigue or ageing, This should be calculated by
inspection of the design data of supporting material and consulting
construction engineer.