22
PV–
PV+
P
C
Fig. 20: Connecting the assembled cable to the SP inverter
6. After connecting the PV strings, ensure that all connectors are in position
by checking for resistance when a slight pull is applied.
5�3
Communication interface
WIFI module implements communication with cloud server through
wireless network to monitor PV inverter‘s data status.
For more details, refer to WIFI product application manual.
6 Commissioning
Follow these steps to start up the inverter:
1. Switch ON the DC disconnector located at the bottom of the inverter
2. Switch on the external switch of the AC feed line connecting the inverter
to the grid.
3. Observe the status of LED indicators on the inverter according to the table
described in
.
When the LED indicators indicate a successful grid connection, the inverter is
connected and ready for operation.
Powering OFF the inverter
To take the inverter out of operation, carry out the following steps:
1. Switch off the external AC breaker.
2. Switch OFF the DC disconnector located at the bottom of the inverter (see
).
10 min
DANGER!
Fatal electric shock hazard!
Components within the inverter are charged with a high
voltage
●
Life threatening hazard due to high voltage in the
inverter! Disconnect the voltage from the inverter.
Wait 10 minutes before opening the inverter.
Содержание 1000SP
Страница 1: ...SolarMax SP series 1000SP 1500SP 2000SP 2500SP 3000SP Instruction Manual...
Страница 2: ...SOLARMAX GmbH Zur Sch nhalde 10 D 89352 Ellzee E Mail info solarmax com SOLARMAX GmbH 2021...
Страница 4: ...4...
Страница 35: ...35 en...