![Solaris Quasar Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/solaris/quasar/quasar_operating-instructions-manual_1313894006.webp)
Quasar Operating Manual
6
INSTALLATION
Unpacking
Do not dispose of the shipping box and the packaging, as
they are useful for transporting the unit. Before shipping,
make sure the unit is packed the same way it was at the
factory. During unpacking, check if the unit is undamaged
and clean. If the unit is damaged, contact the freight
company immediately. If the unit has become wet in the box,
make sure it is completely dry before power-up. If operation
should fail, contact the freight company with your complaint.
Checking accessories
After unpacking the unit, check all accessories and the
condition of the discharge tube (use the mirror behind
the tube). If the tube is damaged, report it to the freight
company immediately.
Accessories:
• XOP 15 (or equivalent) discharge tube
• Mains lead with powerCON connector
• Operating manual
• Rack ears
• 2 barn doors