Step 4: Install the Two Supporting Studs
Install the two studs (2” x 4” x 12”L) on the left side and right side of the
opening, behind the drywall
as showed in Figure 2.
Drive three #10 x 1 1/2"L screws through the drywall into each studs on both
sides (total of six screws to be used). Note that the location of these screws
should be different to the location of the mounting holes on the left and right
side of the dispenser. See Figures 3 for more details.
Step 5: Install the Cover Panel and the Dispenser into the Wall
Remove the protecting film on the outside of the panel. Recommend to put
the cotton glove on the one hand that is used to hold the panel to avoid
finger prints. The other hand that is used to peel the film will not need glove.
Carefully place the dispenser into the big opening on the panel. Then install
the assembly (of the cover and the panel together) into the opening on the
wall. Slide the dispenser all the way in; ensure there is no gap between the
panel and the wall.
Use the key (provided) to open the cover. Drive four #10 screws (provided)
into the mounting holes on the left and right sides of the dispenser to
secure the dispenser to the studs that were mounted in step
4.
See Figure 3 for more details.
The dispenser is now ready for Roll Support installation and paper loading.
3
Figure
2
.
Figure
3
.
the mounting
screws should not
be interenced with
the stud-screws
which are installed
in step 4.
COVER PANEL