![SOLARFOCUS PelletElegance 10 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/solarfocus/pelletelegance-10/pelletelegance-10_manual_1313812019.webp)
5 Installation
Mount the RS air distribution box
►
Route the cable of the primary air holding
magnet in the feed-through
1
.
►
Mount the RS air distribution box
2
with 2 x self-
tapping screws
3
on the primary air box (addi-
tional sealing is not required).
Abb. 2-14
Mount the aluminium hose, clamp the cable
►
Fit the aluminium hose
∅
50 mm for secondary
air
1
and ignition supply air
2
on the connection
pipes; clamp the cable (see following figure) bet-
ween the connection pipe and the aluminium
hose).
Abb. 2-15: View from the front
Clamping the cable at the hose connection
Abb. 2-16:
Mount connection adapter
The outlet for the RS intake line can be either at the
rear of the boiler or on top of boiler.
Abb. 2-17
►
Mount adapter
1
with 2 x Allen screws
2
.
Abb. 2-18
Installation manual
pelletelegance
19