For your safety
4
Installation manual
pellet
top
authorised customer service partner).
If visible damage is ascertained (e.g. leakage of water, thermal deformation, traces of smoke or scorching,
mechanical damage etc.), operation must not be continued or the boiler started up again. The system may
only be operated if it is in perfect technical condition.
If the system is out of operation for lengthy periods, it must be ensured that all parts bearing water are fully
protected against frost.
The system operator is responsible for setting the parameters in the customer menu of the boiler control. As-
delivered condition is always the factory setting, which must be adjusted by the system operator to meet the
individual requirements. The manufacturer cannot be held liable for damage resulting from incorrect adjust-
ment.
The boiler must be operated exclusively in accordance with the planning and installation specifications and
with the relevant regulations, laws and product-specific instructions. The manufacturer accepts no liability for
damage and the consequences of damage resulting from incorrect installation, operation or use of the boiler
or from failure to perform maintenance and cleaning correctly and punctually.
The operator/owner of the system is under obligation to observe the applicable regional guidelines, directives
and laws pertaining to the operation of wood- and pellet-fired combustion systems.
The modification or disabling of safety equipment is strictly prohibited.
The fire, building and electrical engineering requirements and the safety regulations must be complied with in
addition to the instructions in the operation manual and the legal requirements applicable in the country of
use!
Incorrect cleaning and maintenance or failure to perform cleaning and maintenance can lead to serious mal-
functions during combustion and thus cause accidents! Before maintenance work on the boiler: Switch the
boiler off and allow it to cool down!
All checks (service operations), cleaning processes and other events must be entered in an inspection log in
accordance with TRVB H 118.
The minimum effective area of the supply air openings is 200 cm² up to 30 kW, 300 cm² up to 40
kW and 400 cm² up to 60 kW.
Accident prevention regulations
In addition to the instructions contained in this manual, the local accident prevention regulations and the national
industrial safety regulations also apply.
In the event of damage to the insulation, switch off the power supply immediately and have the insulation re-
paired.
Protect live parts against moisture and damp.
Qualification of personnel
The work procedures described must be carried out by qualified specialist personnel.
Work on electrical components must be performed by trained electricians and in accordance with the relevant
laws and directives.
Содержание pellet top touch 35
Страница 25: ...Annex Installation manual pellettop 25 Boiler cascade solution with different storage conveying system...
Страница 26: ...Annex 26 Installation manual pellettop 9 6 Commissioning log...
Страница 27: ...Annex Installation manual pellettop 27...
Страница 28: ...Annex 28 Installation manual pellettop 9 7 Customer service order form...
Страница 29: ...Annex Installation manual pellettop 29...
Страница 30: ...Annex 30 Installation manual pellettop...
Страница 31: ...Annex Installation manual pellettop 31...