Installation
Installation manual
octo
plus
29
Fig. 5-41
Install cover
Position cover
1
.
Work step is only for the
octo
plus
15
Fig. 5-42
Connect pellet hose to boiler
Connect 2 x pellet hoses
1
using
the hinged hose clamps
2
.
3
= return air
4
= suction (pellets)
Observe note on installing hoses,
Fehler! Textmarke nicht
definiert.
Connect suction turbine to X3.
Connect the filling level sensor
5
(of the intermediate pellet store)
to X49.
Fig. 5-43
Position cover
Position cover
1
.
Operation is only for the
octo
plus
15.5 and 22
Содержание octoplus
Страница 40: ...Initial commissioning 40 Installation manual octoplus 8 1 Commissioning log...
Страница 41: ...Initial commissioning Installation manual octoplus 41...
Страница 42: ...Initial commissioning 42 Installation manual octoplus 8 2 Customer service order form...
Страница 45: ...System schematic Installation manual octoplus 45...
Страница 46: ...System schematic 46 Installation manual octoplus...
Страница 47: ...System schematic Installation manual octoplus 47...